共 50 条
- [31] Status of the optical performance for the James Webb Space Telescope SPACE TELESCOPES AND INSTRUMENTATION 2014: OPTICAL, INFRARED, AND MILLIMETER WAVE, 2014, 9143
- [32] Optical performance verification of the James Webb Space Telescope SPACE TELESCOPES AND INSTRUMENTATION 2008: OPTICAL, INFRARED, AND MILLIMETER, PTS 1 AND 2, 2008, 7010
- [33] EMC Testing on the Integrated Science Instrument Module (ISIM) A Summary of the EMC Test Campaign for the Science Payload of the James Webb Space Telescope (JWST) 2016 IEEE INTERNATIONAL SYMPOSIUM ON ELECTROMAGNETIC COMPATIBILITY (EMC), 2016, : 138 - 143
- [34] Cryogenic performance of a high precision photogrammetry system for verification of the James Webb Space Telescope Integrated Science Instrument Module and associated ground support equipment structural alignment requirements OPTICAL SYSTEM ALIGNMENT, TOLERANCING, AND VERIFICATION IV, 2010, 7793
- [36] Integrated modeling under uncertainty for the James Webb Space Telescope MODELING, SYSTEMS ENGINEERING, AND PROJECT MANAGEMENT FOR ASTRONOMY VIII, 2018, 10705
- [37] Preservation of Thermal Control Specular Gold Baffle Surface on the James Webb Space Telescope (JWST) Integrated Science Instrument Module (ISIM) Electronics Compartment (IEC) OPTICAL SYSTEM CONTAMINATION: EFFECTS, MEASUREMENTS, AND CONTROL 2010, 2010, 7794
- [38] Results, Status and Plans for the James Webb Space Telescope Optical Telescope Element SPACE TELESCOPES AND INSTRUMENTATION 2010: OPTICAL, INFRARED, AND MILLIMETER WAVE, 2010, 7731
- [39] Results, status and plans for the James Webb Space Telescope Optical Telescope Element Proc SPIE Int Soc Opt Eng,
- [40] Optical performance for the actively controlled James Webb Space Telescope SPACE TELESCOPES AND INSTRUMENTATION 2010: OPTICAL, INFRARED, AND MILLIMETER WAVE, 2010, 7731