共 50 条
- [21] Integrated Scheduling of Handling Equipment in Automated Container Terminal Considering Quay Crane Faults SYSTEMS, 2024, 12 (11):
- [22] Integrated Scheduling of Dual-cycle AGV and Yard Crane at Automated Container Terminal Jiaotong Yunshu Xitong Gongcheng Yu Xinxi/Journal of Transportation Systems Engineering and Information Technology, 2020, 20 (04): : 216 - 223and243
- [23] A genetic algorithm for the integrated scheduling model of a container-handling system in a maritime terminal Proc. Inst. Mech. Eng. Part M J. Eng. Marit. Environ., 1 (62-77):
- [24] Agent-based automatic shore operating scheduling for a container terminal Yan, N. (nnyan@shmtu.edu.cn), 1600, Universitas Ahmad Dahlan (11): : 653 - 658
- [25] Study on scheduling system based on multi-agent of container terminal 2006 10TH INTERNATIONAL CONFERENCE ON COMPUTER SUPPORTED COOPERATIVE WORK IN DESIGN, PROCEEDINGS, VOLS 1 AND 2, 2006, : 579 - 584
- [26] On Container Terminal Logistics Operational and Scheduling Management System Based on MAS 2011 30TH CHINESE CONTROL CONFERENCE (CCC), 2011, : 5484 - 5489
- [27] Research on Container Terminal Scheduling System Based on Multi-Agent 2009 IITA INTERNATIONAL CONFERENCE ON CONTROL, AUTOMATION AND SYSTEMS ENGINEERING, PROCEEDINGS, 2009, : 399 - +
- [30] Simulation study of container terminal scheduling system Shanghai Jiaotong Daxue Xuebao, 2006, 6 (1024-1030):