Dynamic Simulation Analysis of Temperature Field and Thermal Stress of Concrete Gravity Dam during Construction Period

被引:3
|
作者
Wang, Haibo [1 ]
Qiang, Sheng [1 ]
Sun, Xiao [1 ]
Zheng, Rui [1 ]
机构
[1] Hohai Univ, Coll Water Conservancy & Hydropower Engn, Nanjing 210098, Jiangsu, Peoples R China
来源
关键词
Concrete Gravity Dam; Thermal Stress; Cooling Pipe Discrete Model; Temperature Control Measures for Cracking Prevention; Numerical Modeling;
D O I
10.4028/www.scientific.net/AMM.90-93.2677
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The basic theory of temperature field and stress field of concrete and 3D FEM combining with cooling pipe discrete model and iteration method are used to carry out the dynamic simulation analysis of the temperature filed and stress field of a concrete gravity dam of South-to-North Water Diversion Project. The impacts on cracking mechanism of the surface insulation, internal cooling and environmental climate are considered in calculation. The change laws of temperature field and thermal stress with time and their distributions are analyzed, reasonable temperature control measures are put forward for reference. The results show that good effect of temperature control and cracking prevention is achieved, the proposed measures should have great reference significance to the similar concrete dam in future.
引用
收藏
页码:2677 / 2681
页数:5
相关论文
共 50 条
  • [41] Study on Real-Time Simulation Analysis and Inverse Analysis System for Temperature and Stress of Concrete Dam
    Zhang, Lei
    Liu, Yi
    Li, Bingqi
    Zhang, Guoxin
    Zhang, Songtao
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2015, 2015
  • [42] FEM simulation of temperature and thermal stress of Xiaowan arch dam
    Yang, Xinping
    Chang, XiaoLin
    Liu, Xinghong
    ADVANCES IN HYDROLOGY AND HYDRAULIC ENGINEERING, PTS 1 AND 2, 2012, 212-213 : 887 - 890
  • [43] Simulation on Dam Concrete Construction Processes Using Dynamic Resources Matching Technology
    Liu Quan
    Hu Zhigen
    Han Qi
    2009 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), VOLS 1-7, 2009, : 112 - 115
  • [44] Temperature monitoring test and thermal analysis during construction of deep orifice of arch dam
    Liu, Xueli
    Wang, Feng
    Tan, Tianlong
    Chen, Kete
    Zhao, Chi
    INTERNATIONAL COMMUNICATIONS IN HEAT AND MASS TRANSFER, 2024, 159
  • [45] Temperature control and thermal-induced stress field analysis of GongGuoQiao RCC dam
    Chen, Hongjie
    Liu, Zaobao
    JOURNAL OF THERMAL ANALYSIS AND CALORIMETRY, 2019, 135 (04) : 2019 - 2029
  • [46] Temperature control and thermal-induced stress field analysis of GongGuoQiao RCC dam
    Hongjie Chen
    Zaobao Liu
    Journal of Thermal Analysis and Calorimetry, 2019, 135 : 2019 - 2029
  • [47] Simulation of the temperature field in mass concrete with double layers of cooling pipes during construction
    Duan, Y. (yduan@thu.edu.cn), 1600, Press of Tsinghua University (52):
  • [48] Temperature Control Measures and Temperature Stress of Mass Concrete during Construction Period in High-Altitude Regions
    Wang, Zhenhong
    Tao, Li
    Liu, Yi
    Jiang Yunhui
    ADVANCES IN CIVIL ENGINEERING, 2018, 2018
  • [49] Thermal-structural modeling and temperature control of roller compacted concrete gravity dam
    Malkawi, AIH
    Mutasher, SA
    Qiu, TJ
    JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2003, 17 (04) : 177 - 187
  • [50] Temperature Stress Analysis for Concrete Dam of Jiangya Hydropower Station
    Zhang, Yanyan
    Chen, Caiying
    MECHATRONICS ENGINEERING, COMPUTING AND INFORMATION TECHNOLOGY, 2014, 556-562 : 683 - 686