An Integrated Approach to Flood Risk Management: A Case Study of Navaluenga (Central Spain)

被引:52
|
作者
Ballesteros-Canovas, J. A. [1 ]
Sanchez-Silva, M. [2 ]
Bodoque, J. M. [3 ]
Diez-Herrero, A. [4 ]
机构
[1] Univ Bern, Inst Geol Sci, Lab Dendrogeomorphol, CH-3012 Bern, Switzerland
[2] Univ Los Andes, Dept Civil & Environm Engn, Bogota, Colombia
[3] Univ Castilla La Mancha, Min & Geol Engn Dept, Toledo 45071, Spain
[4] Geol Survey Spain IGME, Dept Res & Geosci Prospect, Madrid 28003, Spain
关键词
Flood risk; Hydrological model; Hydraulic model; Flood damages; Uncertainties; Tree-rings; Navaluenga; PALEOFLOOD HYDROLOGY; UNCERTAINTIES; SYSTEM; PLAN;
D O I
10.1007/s11269-013-0332-1
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Flood risk management decisions require the rational assessment of mitigation strategies. This is a complex decision-making process involving many uncertainties. This paper presents a case study where a cost-benefit based methodology is used to define the best intervention measures for flood-risk mitigation in central Spain. Based on different flood hazard scenarios, several structural measures considered by the local Basin Water Authority and others defined by engineering criteria were checked for operability. Non-systematic data derived from dendrogeomorphological analysis of riparian trees were included in the flood frequency analysis. Flood damage was assessed by means of depth-damage functions, and flooded urban areas were obtained by applying a hydraulic model. The best defense strategies were obtained by a cost-benefit procedure, where uncertainties derived from each analytical process were incorporated based on a stochastic approach to estimate expected economic losses. The results showed that large structural solutions are not economically viable when compared with other smaller structural measures, presumably because of the pre-established location of dams in the upper part of the basin which do not laminate the flow generated by the surrounding catchment to Navaluenga.
引用
收藏
页码:3051 / 3069
页数:19
相关论文
共 50 条
  • [21] A system archetype approach to identify behavioural patterns in flood risk management: Case study of Cameroon
    Awah, Lum Sonita
    Nyam, Yong Sebastian
    Belle, Johanes Amate
    Orimoloye, Israel Ropo
    ENVIRONMENTAL DEVELOPMENT, 2024, 51
  • [22] Risk sharing in practice for Integrated Flood Management
    Murase, Masahiko
    FLOODS: FROM RISK TO OPPORTUNITY, 2013, 357 : 117 - 126
  • [23] Towards Integrated Flood Risk and Resilience Management
    Fu, Guangtao
    Meng, Fanlin
    Rivas Casado, Monica
    Kalawsky, Roy S.
    WATER, 2020, 12 (06)
  • [24] Integrated approach to materials management: a case study
    Dey, PK
    HYDROCARBON PROCESSING, 2002, 81 (11): : 57 - +
  • [25] Integrated Flood Risk Management in England and Wales
    Hall, Jim W.
    Meadowcroft, Ian C.
    Sayers, Paul B.
    Bramley, Mervyn E.
    NATURAL HAZARDS REVIEW, 2003, 4 (03) : 126 - 135
  • [26] Flood Risk Management: The Dutch Approach
    van der Weide, Jentje
    MEDCOAST 11, VOLS 1 AND 2, 2011, : 639 - 649
  • [27] Flood risk management an illustrative approach
    Lummen, Natainia S.
    Shirozu, Hajime
    Okada, Norio
    Yamada, Fumihiko
    INTERNATIONAL JOURNAL OF DISASTER RESILIENCE IN THE BUILT ENVIRONMENT, 2016, 7 (04) : 388 - 405
  • [28] Disaster management -: Flood risk in central Europe
    Becker, A
    Grünewald, U
    SCIENCE, 2003, 300 (5622) : 1099 - 1099
  • [29] Recent Slovak flood protection relative to integrated flood risk management
    Solin, Lubomir
    INTERNATIONAL JOURNAL OF RIVER BASIN MANAGEMENT, 2015, 13 (04) : 463 - 473
  • [30] Integrated Flood Risk Management Approach Using Mesh Grid Stability and Hydrodynamic Model
    Pathan, Azazkhan
    Kantamaneni, Komali
    Agnihotri, Prasit
    Patel, Dhruvesh
    Said, Saif
    Singh, Sudhir Kumar
    SUSTAINABILITY, 2022, 14 (24)