Simulation-based life cycle cost modeling and maintenance plan for water mains

被引:16
|
作者
Shahata, Khaled [1 ]
Zayed, Tarek [2 ]
机构
[1] AECOM, Mississauga, ON, Canada
[2] Concordia Univ, Dept Bldg Civil & Environm Engn, Montreal, PQ, Canada
关键词
models; water distribution systems; infrastructure; underground structure; rehabilitation; life cycle cost;
D O I
10.1080/15732479.2011.552509
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Life cycle cost (LCC) is an essential approach to decide on alternative rehabilitation strategies for infrastructure systems, such as water mains. The research presented in this article identifies several rehabilitation methods for water mains, which are classified into three main categories: repair, renovation and replacement. A simulation-based LCC (SLCC) model is developed to compare different rehabilitation scenarios/alternatives for various types of water mains (i.e. cast iron, ductile iron, concrete, polyvinyl chloride and asbestos cement). Results show that open trench and slip lining are the most appropriate methods for the repair and renovation categories, respectively. However, the most suitable method for the replacement category is pipe bursting for pipe diameters less than 750 mm (<30?) and open cut for pipe diameters greater than 750 mm (>30?). A rehabilitation plan is developed based on the SLCC results. This plan recommends repairing pipes using open trench until the breakage rate reaches 0.5 breaks/km/year, then, replace the pipe beyond this threshold. Based on the designed SLCC model, web-based software is developed to determine the optimal rehabilitation scenarios. The developed model and software help academics and practitioners (e.g. municipal engineers) to predict the suitable new installation and/or rehabilitation programs as well as their corresponding costs.
引用
收藏
页码:403 / 415
页数:13
相关论文
共 50 条
  • [21] A SIMULATION-BASED WATER MANAGEMENT STRATEGY FOR LIFE-OF-MINE WATER PLANNING
    Monteiro, C. A.
    van Laar, J. H.
    Schutte, C. S. L.
    SOUTH AFRICAN JOURNAL OF INDUSTRIAL ENGINEERING, 2022, 33 (03) : 248 - 261
  • [22] A life cycle for modeling and simulation
    Balci, Osman
    SIMULATION-TRANSACTIONS OF THE SOCIETY FOR MODELING AND SIMULATION INTERNATIONAL, 2012, 88 (07): : 870 - 883
  • [23] Stochastic modelling for the maintenance of life cycle cost of rails using Monte Carlo simulation
    Vandoorne, Rick
    Grabe, Petrus J.
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART F-JOURNAL OF RAIL AND RAPID TRANSIT, 2018, 232 (04) : 1240 - 1251
  • [24] SYSTEMATIC APPROACH TO OPTIMIZE COST DRIVERS BASED ON LIFE CYCLE COST MODELING
    Johannknecht, Florian
    Gatzen, Matthias
    Lachmayer, Roland
    DS87-5 PROCEEDINGS OF THE 21ST INTERNATIONAL CONFERENCE ON ENGINEERING DESIGN (ICED 17), VOL 5: DESIGN FOR X, DESIGN TO X, 2017, : 121 - 130
  • [25] Evaluation of hydrometallurgical black mass recycling with simulation-based life cycle assessment
    Rinne, Marja
    Aromaa-Stubb, Riina
    Elomaa, Heini
    Porvali, Antti
    Lundstroem, Mari
    INTERNATIONAL JOURNAL OF LIFE CYCLE ASSESSMENT, 2024, 29 (09): : 1582 - 1597
  • [26] Simulation-Based Network Maintenance Planning and Scheduling
    Wang, Shiaau-Lir
    Yang, Ning
    Schonfeld, Paul
    TRANSPORTATION RESEARCH RECORD, 2009, (2100) : 94 - 102
  • [27] Statistical Simulation of Life Cycle Cost
    Vlachy, Jan
    HRADEC ECONOMIC DAYS 2020, VOL 10, PT 1, 2020, 10 : 842 - 847
  • [28] A Review of Simulation-based Optimisation in Maintenance Operations
    Alrabghi, Abdullah
    Tiwari, Ashutosh
    UKSIM-AMSS 15TH INTERNATIONAL CONFERENCE ON COMPUTER MODELLING AND SIMULATION (UKSIM 2013), 2013, : 353 - 358
  • [29] Maintenance plan optimization of engineering structures based on life-cycle environmental costs
    Wang Z.
    Xu Z.
    Wu K.
    Jin W.
    Jianzhu Jiegou Xuebao/Journal of Building Structures, 2019, 40 (02): : 227 - 237
  • [30] Life-cycle cost modeling
    1600, World Scientific Publishing Co. Pte Ltd (04):