共 50 条
- [21] An effective shuffled frog-leaping algorithm for lot-streaming flow shop scheduling problem The International Journal of Advanced Manufacturing Technology, 2011, 52 : 699 - 713
- [22] An effective shuffled frog-leaping algorithm for lot-streaming flow shop scheduling problem INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 52 (5-8): : 699 - 713
- [23] Blocking flow shop scheduling problem based on migrating birds optimization Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2015, 21 (08): : 2099 - 2107
- [24] Migrating birds optimization for hybrid flow shop scheduling problem with makespan PROCEEDINGS OF THE 2017 6TH INTERNATIONAL CONFERENCE ON MEASUREMENT, INSTRUMENTATION AND AUTOMATION (ICMIA 2017), 2017, 154 : 689 - 692
- [27] Single-lot, lot-streaming problem for a 1 + m hybrid flow shop Journal of Global Optimization, 2024, 89 : 435 - 455
- [29] A Discrete Invasive Weed Optimization Algorithm for the No-Wait Lot-Streaming Flow Shop Scheduling Problems INTELLIGENT COMPUTING THEORIES AND APPLICATION, ICIC 2016, PT I, 2016, 9771 : 517 - 526