Mathematical model for maintenance planning of machine tools

被引:1
|
作者
Pires, C. R. [1 ,2 ]
Lopes, I. S. [1 ]
Basto, L. P. [1 ]
机构
[1] Univ Minho, ALGORITMI Res Ctr, Campus Azurem, P-4800058 Guimaraes, Portugal
[2] CATIM, Ctr Apoio Tecnolog Ind Metalomecan, Rua Platanos 197, P-4100414 Porto, Portugal
关键词
Age based replacement; Opportunistic maintenance; Preventive maintenance; Series system; PREVENTIVE MAINTENANCE; REPLACEMENT; SYSTEM; POLICY;
D O I
10.1016/j.promfg.2020.01.210
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Preventive maintenance planning of machine tools may be a complex task for tools with multiple components. For manufacturing processes with high setup and downtime costs, components replacement should be combined to avoid too many production stoppages and therefore reduce costs. The combination that minimizes costs should take into account the lifetime distribution and the age of each component at the replacement time. Replacing too soon may imply a high number of replacements for a given component, while replacing too late may imply a high number of failures that lead to shutdowns, increasing costs. In this paper, a tool is seen as a series system, which means that whenever a component fails, a corrective action is needed and at least the failed component has to be replaced. In the literature, some of the models and heuristics for maintenance planning of series systems consider that a minimal repair is made when a component fails, while other models propose static approaches, i.e., the same combination and the same interval is used over time regardless of the ages of the components involved. This paper aims to propose a dynamic approach and presents a mathematical model to determine both the next time to perform a preventive maintenance task and the components that should be replaced in order to minimize the total cost. The model also intends to determine the components to be replaced preventively when unexpected events occur (such as the failure of a tool component or the machine, the shortage of raw material, etc.) or during planned stoppages (such as the end of a production order, machine preventive maintenance task, etc.). (C) 2019 The Authors. Published by Elsevier B.V.
引用
收藏
页码:1197 / 1204
页数:8
相关论文
共 50 条
  • [21] A mathematical model for the joint planning of maintenance and safety stock in deteriorating imperfect manufacturing systems
    Hadian, S. M.
    Farughi, H.
    Rasay, H.
    SCIENTIA IRANICA, 2023, 30 (01) : 318 - 335
  • [22] USE OF MATHEMATICAL PLANNING OF AN EXPERIMENT FOR DESIGNING A FUNCTIONAL MODEL OF A TABLETTING MACHINE FEEDER
    KOLMANIVANOV, EE
    VALTER, MB
    VEKSLER, MA
    SLOBODCHIKOVA, RI
    KHIMIKO-FARMATSEVTICHESKII ZHURNAL, 1976, 10 (02): : 126 - 131
  • [23] An integrated mathematical model of dynamic production and maintenance planning in pumped-storage hydroelectricity
    Asgari, Farid
    Jolai, Fariborz
    Movahedisobhani, Farzad
    JOURNAL OF MODELLING IN MANAGEMENT, 2022, 17 (04) : 1213 - 1240
  • [24] Planning machine maintenance in two-machine shop scheduling
    Kubzin, M. A.
    Strusevich, V. A.
    OPERATIONS RESEARCH, 2006, 54 (04) : 789 - 800
  • [25] Mathematical programming approaches for the management of maintenance planning and scheduling
    Duffuaa, S.O.
    Al-Sultan, K.S.
    Journal of Quality in Maintenance Engineering, 1997, 3 (03): : 163 - 176
  • [26] Planning maintenance tasks in airline operating companies: A mathematical programming model applied to a case study
    Agostinho, Francisco
    Martinho, Martim
    Alves, Tiago
    Andrade, Antonio R.
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART O-JOURNAL OF RISK AND RELIABILITY, 2025,
  • [27] Development of remote monitoring and maintenance system for machine tools
    Mori, M.
    Fujishima, M.
    Komatsu, M.
    Zhao, Bingyan
    Liu, Yadong
    CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2008, 57 (01) : 433 - 436
  • [28] Remote monitoring and maintenance system for CNC machine tools
    Mori, M.
    Fujishima, M.
    EIGHTH CIRP CONFERENCE ON INTELLIGENT COMPUTATION IN MANUFACTURING ENGINEERING, 2013, 12 : 7 - 12
  • [29] A Bayesian semiparametric analysis of the reliability and maintenance of machine tools
    Merrick, JRW
    Soyer, R
    Mazzuchi, TA
    TECHNOMETRICS, 2003, 45 (01) : 58 - 69
  • [30] Single-machine-based production scheduling model integrated preventive maintenance planning
    Ershun Pan
    Wenzhu Liao
    Lifeng Xi
    The International Journal of Advanced Manufacturing Technology, 2010, 50 : 365 - 375