Mathematical model for maintenance planning of machine tools

被引:1
|
作者
Pires, C. R. [1 ,2 ]
Lopes, I. S. [1 ]
Basto, L. P. [1 ]
机构
[1] Univ Minho, ALGORITMI Res Ctr, Campus Azurem, P-4800058 Guimaraes, Portugal
[2] CATIM, Ctr Apoio Tecnolog Ind Metalomecan, Rua Platanos 197, P-4100414 Porto, Portugal
关键词
Age based replacement; Opportunistic maintenance; Preventive maintenance; Series system; PREVENTIVE MAINTENANCE; REPLACEMENT; SYSTEM; POLICY;
D O I
10.1016/j.promfg.2020.01.210
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Preventive maintenance planning of machine tools may be a complex task for tools with multiple components. For manufacturing processes with high setup and downtime costs, components replacement should be combined to avoid too many production stoppages and therefore reduce costs. The combination that minimizes costs should take into account the lifetime distribution and the age of each component at the replacement time. Replacing too soon may imply a high number of replacements for a given component, while replacing too late may imply a high number of failures that lead to shutdowns, increasing costs. In this paper, a tool is seen as a series system, which means that whenever a component fails, a corrective action is needed and at least the failed component has to be replaced. In the literature, some of the models and heuristics for maintenance planning of series systems consider that a minimal repair is made when a component fails, while other models propose static approaches, i.e., the same combination and the same interval is used over time regardless of the ages of the components involved. This paper aims to propose a dynamic approach and presents a mathematical model to determine both the next time to perform a preventive maintenance task and the components that should be replaced in order to minimize the total cost. The model also intends to determine the components to be replaced preventively when unexpected events occur (such as the failure of a tool component or the machine, the shortage of raw material, etc.) or during planned stoppages (such as the end of a production order, machine preventive maintenance task, etc.). (C) 2019 The Authors. Published by Elsevier B.V.
引用
收藏
页码:1197 / 1204
页数:8
相关论文
共 50 条
  • [1] Approach for Preventive Maintenance Planning of Machine Tools
    Pires, C. R.
    Lopes, I. S.
    Basto, L. P.
    TRANSDISCIPLINARY ENGINEERING METHODS FOR SOCIAL INNOVATION OF INDUSTRY 4.0, 2018, 7 : 966 - 975
  • [2] Condition based maintenance planning of highly productive machine tools
    Denkena B.
    Bluemel P.
    Kroening S.
    Roebbing J.
    Production Engineering, 2012, 6 (3) : 277 - 285
  • [3] A Mathematical Optimization Model for Maintenance Planning of School Buildings
    Zandiyehvakili, Mehdi
    Aminnejad, Babak
    Lork, Alireza
    INTELLIGENT AUTOMATION AND SOFT COMPUTING, 2022, 32 (01): : 499 - 512
  • [4] Markov Reward Approach and Reliability Associated Cost Model for Machine Tools Maintenance-Planning Optimization
    Zeng Wenbin
    Frenkel, Ilia
    Shen Guixiang
    Bolvashenkov, Igor
    Kammermann, Joerg
    Herzog, Hans-Georg
    Khvatskin, Lev
    INTERNATIONAL JOURNAL OF MATHEMATICAL ENGINEERING AND MANAGEMENT SCIENCES, 2019, 4 (04) : 824 - 840
  • [5] A novel mathematical model for Integration of Production Planning and Maintenance Scheduling
    Rastgar, I.
    Rezaeian, J.
    Mahdavi, I.
    Fattahi, P.
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND MANAGEMENT, 2023, 14 (02): : 122 - 137
  • [6] An integrated mathematical model for production scheduling and preventive maintenance planning
    Kolus, Ahmet
    El-Khalifa, Ahmed
    Al-Turki, Umar M.
    Duffuaa, Salih Osman
    INTERNATIONAL JOURNAL OF QUALITY & RELIABILITY MANAGEMENT, 2020, 37 (6-7) : 925 - 937
  • [7] MAINTENANCE OF MACHINE-TOOLS
    ZAWADZKI, J
    MECHANIK MIESIECZNIK NAUKOWO-TECHNICZNY, 1980, 53 (01): : 43 - 45
  • [8] Process and knowledge management in a collaborative maintenance planning system for high value machine tools
    Wan, Shan
    Li, Dongbo
    Gao, James
    Roy, Rajkumar
    Tong, Yifei
    COMPUTERS IN INDUSTRY, 2017, 84 : 14 - 24
  • [9] Playful Probing: Towards Understanding the Interaction with Machine Learning in the Design of Maintenance Planning Tools
    Ribeiro, Jorge
    Roque, Licinio
    AEROSPACE, 2022, 9 (12)
  • [10] Improving Maintenance Activities of Machine Tools
    Denes, Calin
    Grecu, Valentin
    INNOVATIVE MANUFACTURING ENGINEERING, 2013, 371 : 837 - 841