Commissioning the CMS experiment

被引:0
|
作者
Camporesi, Tiziano [1 ]
机构
[1] CERN, PH Dept, Geneva, Switzerland
关键词
HEP; Proceedings; CMS; commissioning; LHC;
D O I
10.1142/9789812819093_0074
中图分类号
O59 [应用物理学];
学科分类号
摘要
The CMS experiment is getting ready to take data at the LHC accelerator at CERN. Due to late delivery of the experimental caverns the detector had to be pre-assembled on the surface and lowered in large segments. This has constrained the commissioning strategy of the experiment. Global commissioning has started in Spring of 2007 and has progressed in parallel with the construction and assembly of detector and services underground. This paper describes the strategy adopted in order to commission components of the system in incremental steps in order to be ready to accept collisions from LHC with a well debugged and understood system, including the detector, acquisition system, trigger, software, computing and data shipping.
引用
收藏
页码:424 / 435
页数:12
相关论文
共 50 条
  • [41] Commissioning and early physics analysis with the ATLAS and CMS experiments
    Hoecker, A.
    2009 CERN-LATIN-AMERICAN SCHOOL OF HIGH-ENERGY PHYSICS, 2010, 5 : 449 - 529
  • [42] CMS Silicon Strip Tracker Commissioning and Preliminary Performances
    Palmonari, F. M.
    NUCLEAR PHYSICS B-PROCEEDINGS SUPPLEMENTS, 2009, 197 : 121 - 124
  • [43] The Commissioning of the CMS Electromagnetic Calorimeter Light Monitoring System
    Orimoto, Toyoko J.
    2008 IEEE NUCLEAR SCIENCE SYMPOSIUM AND MEDICAL IMAGING CONFERENCE (2008 NSS/MIC), VOLS 1-9, 2009, : 1533 - 1535
  • [44] Installation and commissioning of the helium refrigeration system for the CMS magnet
    Perinic, G
    Dupont, T
    Legrand, D
    Pezzetti, M
    IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2004, 14 (02) : 1708 - 1710
  • [45] The CMS muon barrel drift tubes system commissioning
    Abbiendi, G.
    Amapane, N.
    Battilana, C.
    Fernandez Bedoya, C.
    Bellan, R.
    Bellato, M.
    Benvenuti, A. C.
    Biallas, P.
    Bolognesi, S.
    Braibant, S.
    Cavallo, F. R.
    Carlin, R.
    Cerminara, G.
    Chamizo, M.
    Conti, E.
    Dallavalle, G. M.
    Dattola, D.
    Dellacasa, G.
    Fouz, M. C.
    Frangenheim, J.
    Giacomelli, P.
    Giunta, M.
    Gonella, F.
    Gresele, A.
    Guiducci, L.
    Hoepfner, K.
    Jacobi, E.
    Marcellini, S.
    Mariotti, C.
    Maselli, S.
    Masetti, G.
    Meneguzzo, A. T.
    Mila, G.
    Monaco, V.
    Montanari, A.
    Montecassiano, F.
    Navarria, F. L.
    Nervo, M.
    Odorici, F.
    Passaseo, M.
    Parenti, A.
    Perrotta, A.
    Puerta, J.
    Reithler, H.
    Ronchese, P.
    Rovelli, T.
    Sacchi, R.
    Siroli, G. P.
    Sowa, M.
    Staiano, A.
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2009, 598 (01): : 192 - 195
  • [46] Commissioning, operation and performance of the CMS drift tube chambers
    Cerminara, Gianluca
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2010, 617 (1-3): : 144 - 145
  • [47] Commissioning, Performance and Calibration of Crystals of the CMS Electromagnetic Calorimeter
    Yang, Yong
    35TH INTERNATIONAL CONFERENCE OF HIGH ENERGY PHYSICS (ICHEP 2010), 2010,
  • [48] Construction and commissioning of CMS CE prototype silicon modules
    Acar, B.
    Adamov, G.
    Adloff, C.
    Afanasiev, S.
    Akchurin, N.
    Akgun, B.
    Alhusseini, M.
    Alison, J.
    Altopp, G.
    Alyari, M.
    An, S.
    Anagul, S.
    Andreev, I
    Andrews, M.
    Aspell, P.
    Atakisi, I. A.
    Bach, O.
    Baden, A.
    Bakas, G.
    Bakshi, A.
    Banerjee, S.
    Bargassa, P.
    Barney, D.
    Becheva, E.
    Behera, P.
    Belloni, A.
    Bergauer, T.
    Besancon, M.
    Bhattacharya, S.
    Bhattacharya, S.
    Bhowmik, D.
    Bloch, P.
    Bodek, A.
    Bombardi, G.
    Bonanomi, M.
    Bonnemaison, A.
    Bonomally, S.
    Borg, J.
    Bouyjou, F.
    Braga, D.
    Brashear, J.
    Brondolin, E.
    Bryant, P.
    Bueghly, J.
    Bilki, B.
    Burkle, B.
    Butler-Nalin, A.
    Callier, S.
    Calvet, D.
    Cao, X.
    JOURNAL OF INSTRUMENTATION, 2021, 16 (04)
  • [49] CMS Electromagnetic Trigger commissioning and first operation experiences
    Paganini, Pascal
    XIII INTERNATIONAL CONFERENCE ON CALORIMETRY IN HIGH ENERGY PHYSICS, 2009, 160
  • [50] The commissioning and first results on the performance of the CMS Preshower Detector
    Ming, Chia Kuo
    XIV INTERNATIONAL CONFERENCE ON CALORIMETRY IN HIGH ENERGY PHYSICS (CALOR 2010), 2011, 293