Optimizing Jack-up vessel strategies for maintaining offshore wind farms

被引:5
|
作者
Stalhane, Magnus [1 ,2 ]
Christiansen, Marielle [1 ]
Kirkeby, Odin [1 ]
Mikkelsen, Andreas Jebsen [1 ]
机构
[1] NTNU, Dept Ind Econ & Technol Management, Alfred Getz Veg 3, NO-7491 Trondheim, Norway
[2] SINTEF Ocean, Dept Maritime, POB 4125, NO-7450 Trondheim, Norway
关键词
Jack-up vessels; Operations & maintenance; Stochastic programming; MAINTENANCE OPERATIONS; OPTIMIZATION; MODEL;
D O I
10.1016/j.egypro.2017.10.353
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
In this paper we present a new two-stage stochastic mathematical programming model that determines the optimal jack-up vessel strategy for an offshore wind farm. Given an offshore wind farm site, and distance to shore the model decides when, and for how long, a jack-up vessel should be chartered in order to minimize the total expected cost. The model considers both chartering and operational costs of the jack-up vessels, and the downtime costs of the wind farm which occurs when the wind turbines are not producing electricity. The model considers uncertainty both in the weather conditions and in when and how many components fail each year at the wind farm. (C) 2017 The Authors. Published by Elsevier Ltd.
引用
收藏
页码:291 / 298
页数:8
相关论文
共 50 条
  • [21] JACK-UP UNIT SAVES OFFSHORE CONSTRUCTION TIME.
    Kennedy, John L., 1600, (71):
  • [22] Optimizing vessel fleet size and mix to support maintenance operations at offshore wind farms
    Stalhane, Magnus
    Halvorsen-Weare, Elin E.
    Nonas, Lars Magne
    Pantuso, Giovanni
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2019, 276 (02) : 495 - 509
  • [23] Pioneering UK jack-up support vessel from Bollinger
    不详
    NAVAL ARCHITECT, 1996, : 26 - &
  • [24] Topology optimization of jack-up offshore platform leg structure
    Deng, Wei
    Tian, Xiaojie
    Han, Xiangyu
    Liu, Guijie
    Xie, Yingchun
    Li, Zhixiong
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART M-JOURNAL OF ENGINEERING FOR THE MARITIME ENVIRONMENT, 2021, 235 (01) : 165 - 175
  • [25] EXPERIMENTAL ASSESSMENT OF THE OFFSHORE LAUNCHING OPERATION OF A JACK-UP UNIT
    Rodriguez, Claudio A.
    Esperanca, Paulo T. T.
    Moura, Mario
    Raigorodsky, Jacques
    33RD INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARCTIC ENGINEERING, 2014, VOL 1B, 2014,
  • [26] EVOLUTION OF THE DESIGN OF A JACK-UP TYPE OFFSHORE STRUCTURE.
    Giblon, R.P.
    Minorsky, V.U.
    Marine Technology, 1975, 12 (01) : 50 - 59
  • [27] Reduction of jack-up and crane vessel resistance and bow swamping
    Latorre, Robert
    Arana, Julio
    OCEAN ENGINEERING, 2006, 33 (14-15) : 2000 - 2011
  • [28] Dynamic Response and Reliability of Six-Leg Jack-Up Type Wind Turbine Installation Vessel
    Heo, Sanghwan
    Koo, Weoncheol
    Park, Min-Su
    INTERNATIONAL JOURNAL OF STRUCTURAL STABILITY AND DYNAMICS, 2017, 17 (03)
  • [29] Design of control system for hydraulic lifting platform with jack-up wind-power installation vessel
    Yang, Xuejin
    Chen, Dingfang
    Dong, Mingwang
    Li, Taotao
    Lecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics), 2013, 7719 LNCS : 711 - 718
  • [30] Effect of Foundation Modeling On Extreme Response of Offshore Jack-Up Unit
    Jafari, Azadeh
    Asgarian, Behrouz
    Daghigh, Mohammad
    PROCEEDINGS OF THE ASME 29TH INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARCTIC ENGINEERING, 2010, VOL 1, 2010, : 475 - 481