An Ensemble of Meta-Heuristics for the Energy-Efficient Blocking Flowshop Scheduling Problem

被引:3
|
作者
Kizilay, Damla [1 ]
Tasgetiren, M. Fatih [2 ]
Pan, Quan-Ke [3 ]
Suer, Gursel [4 ]
机构
[1] Izmir Democracy Univ, Dept Ind Engn, TR-35140 Izmir, Turkey
[2] Qatar Univ, Ind & Mech Engn Dept, Doha, Qatar
[3] Shanghai Univ, Sch Mechatron Engn & Automat, Shanghai 200072, Peoples R China
[4] Ohio Univ, Russ Coll Engn & Technol, Dept Ind & Syst Engn, Athens, OH 45701 USA
基金
中国国家自然科学基金;
关键词
ensemble of meta-heuristic; blocking flowshop scheduling; energy-efficient scheduling; mathematical modeling; POWER-CONSUMPTION; SHOP; ALGORITHM; MAKESPAN;
D O I
10.1016/j.promfg.2020.01.352
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This study presents an energy-efficient multi-objective ensemble of meta-heuristics (MO-EMH) including three different strategies, multi-objective genetic algorithm (MOGA) and multi-objective genetic algorithm with local search (MOGALs) for the Blocking Permutation Flowshop Scheduling Problem (BPFSP). The current research in the literature on BPFSP considers only the traditional production efficiency measures such as makespan, total flowtime or total tardiness. To the best of our knowledge, there exists no study considering the energy consumption in BPFSP. We study the bi-objective energy-efficient BPFSP (EE-BPFSP) and develop a bi-objective mixed-integer linear programming (MILP) model in order to analyze the trade-off between the makespan (Cmax) and total energy consumption (TEC). The augmented-epsilon constraint method is used for generating the Pareto optimal solution sets for the Taillard's well-known benchmark suite. As a metaheuristic method, MO-EMH, MOGA, and MOGALs are employed to solve this complex problem. Through extensive computational experiments, we show that the MO-EMH algorithm is extremely effective for solving the benchmark instances when compared to both MOGA algorithms. (C) 2019 The Authors. Published by Elsevier Ltd.
引用
收藏
页码:1177 / 1184
页数:8
相关论文
共 50 条
  • [31] Efficient heuristics for the parallel blocking flow shop scheduling problem
    Ribas, Imma
    Companys, Ramon
    Tort-Martorell, Xavier
    EXPERT SYSTEMS WITH APPLICATIONS, 2017, 74 : 41 - 54
  • [32] Meta-heuristics for the single-machine scheduling total weighted tardiness problem
    Madureira, Ana Maria
    Proceedings of the IEEE International Symposium on Assembly and Task Planning, 1999, : 405 - 410
  • [33] Hybrid meta-heuristics for the unrelated parallel machine scheduling problem with setup times
    Fang, Wei
    Zhu, Haolin
    Mei, Yi
    KNOWLEDGE-BASED SYSTEMS, 2022, 241
  • [34] Meta-heuristics for manufacturing scheduling and logistics problems
    Liao, Ching-Jong
    Gen, Mitsuo
    Tiwari, Manoj Kumar
    Chang, Pei-Chann
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 141 (01) : 1 - 3
  • [35] Heuristics and metaheuristics for mixed blocking constraints flowshop scheduling problems
    Trabelsi, Wajdi
    Sauvey, Christophe
    Sauer, Nathalie
    COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (11) : 2520 - 2527
  • [36] A Discrete Artificial Bee Colony Algorithm for the Energy-Efficient No-Wait Flowshop Scheduling Problem
    Tasgetiren, M. Fatih
    Yuksel, Damla
    Gao, Liang
    Pan, Quan-Ke
    Li, Peigen
    25TH INTERNATIONAL CONFERENCE ON PRODUCTION RESEARCH MANUFACTURING INNOVATION: CYBER PHYSICAL MANUFACTURING, 2019, 39 : 1223 - 1231
  • [37] A Variable Iterated Local Search Algorithm for Energy-Efficient No-idle Flowshop Scheduling Problem
    Tasgetiren, M. Fatih
    Oztop, Hande
    Gao, Liang
    Pan, Quan-Ke
    Li, Xinyu
    25TH INTERNATIONAL CONFERENCE ON PRODUCTION RESEARCH MANUFACTURING INNOVATION: CYBER PHYSICAL MANUFACTURING, 2019, 39 : 1185 - 1193
  • [38] Two meta-heuristics for three-stage assembly flowshop scheduling with sequence-dependent setup times
    Hatami, Sara
    Ebrahimnejad, Sadalah
    Tavakkoli-Moghaddam, Reza
    Maboudian, Yasaman
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 50 (9-12): : 1153 - 1164
  • [39] Two meta-heuristics for three-stage assembly flowshop scheduling with sequence-dependent setup times
    Sara Hatami
    Sadalah Ebrahimnejad
    Reza Tavakkoli-Moghaddam
    Yasaman Maboudian
    The International Journal of Advanced Manufacturing Technology, 2010, 50 : 1153 - 1164
  • [40] Ensemble meta-heuristics and Q-learning for solving unmanned surface vessels scheduling problems
    Gao, Minglong
    Gao, Kaizhou
    Ma, Zhenfang
    Tang, Weiyu
    SWARM AND EVOLUTIONARY COMPUTATION, 2023, 82