The problems and suggestions of the desulfurization wastewater Treatment system during the operation

被引:4
|
作者
Dong, Xuefeng [1 ]
Shen, Guifen [1 ]
Zhou, Xiaoxiang [1 ]
Guo, Jinjuan [1 ]
Zhang, Xueying [1 ]
Wu, Wenlong [1 ]
机构
[1] Henan Elect Power Res Inst, Zhengzhou 450052, Peoples R China
来源
关键词
desulfurization waste water; operation and control; problems and suggestions;
D O I
10.4028/www.scientific.net/AMR.599.521
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Wastewater treatment system was an important part of the wet desulfurization, and it played an important role to improve the quality of absorber slurry. Combined with the problems of desulfurization efficient reduced and moisture content in gypsum exceed normal, this paper pointed out the deficiencies which used the chlorine ion concentration to control the operation of desulfurization waster water; and suggested the influence of chlorine ion and the other impurities should be studied comprehensively, some guides for in-service supervision on the operation of FGD should be established as soon as possible.
引用
收藏
页码:521 / 524
页数:4
相关论文
共 50 条
  • [41] A technique for normalizing the operation of biological wastewater treatment plants during the bulking of activated sludge
    Kravchenko, A. V.
    Zalevskii, V. S.
    JOURNAL OF WATER CHEMISTRY AND TECHNOLOGY, 2009, 31 (05) : 334 - 340
  • [42] Carbon nanomaterials transformation during the water and wastewater treatment system
    Li, Yao
    ABSTRACTS OF PAPERS OF THE AMERICAN CHEMICAL SOCIETY, 2019, 257
  • [43] A technique for normalizing the operation of biological wastewater treatment plants during the bulking of activated sludge
    A. V. Kravchenko
    V. S. Zalevskii
    Journal of Water Chemistry and Technology, 2009, 31 : 334 - 340
  • [44] Simulation of the operation of an industrial wet flue gas desulfurization system
    Kallinikos, L. E.
    Farsari, E. I.
    Spartinos, D. N.
    Papayannakos, N. G.
    FUEL PROCESSING TECHNOLOGY, 2010, 91 (12) : 1794 - 1802
  • [45] The Problems and Relevant Suggestions of the Guarantor Pending Trial System
    Zhang, Jitao
    2017 2ND PMSS INTERNATIONAL CONFERENCE ON TEACHING RESEARCH AND SOCIAL SCIENCE (PMSS-TRSS 2017), 2017, 102 : 176 - 179
  • [46] Introduction and Operation of Advanced Environmental Systems: Geothermal Heat Collection System and New Wastewater Treatment System
    Yazawa, Yasushi
    Mori, Yuichi
    Takizawa, Masato
    Yazawa, Masahiro
    Hashizume, Masaaki
    FUJITSU SCIENTIFIC & TECHNICAL JOURNAL, 2014, 50 (04): : 92 - 98
  • [47] Ammonia release characteristics during desulfurization wastewater evaporation: Mechanisms and implications
    Chen, Heng
    Hou, Dawei
    Li, Zhihao
    Zhan, Lingxiao
    Jin, Lijian
    Zheng, Suoqi
    Wang, Yurui
    Wu, Hao
    Zhao, Ning
    Lin, Liliang
    Yang, Linjun
    JOURNAL OF WATER PROCESS ENGINEERING, 2024, 57
  • [48] Introduction and operation of advanced environmental systems: Geothermal heat collection system and new wastewater treatment system
    Yazawa, Yasushi
    Mori, Yuichi
    Takizawa, Masato
    Yazawa, Masahiro
    Hashizume, Masaaki
    Fujitsu Scientific and Technical Journal, 2014, 50 (04): : 92 - 98
  • [49] Release and migration characteristics of chlorine during the desulfurization wastewater evaporation process
    Chen, Heng
    Liu, Fengjun
    Cai, Chenjian
    Zhan, Lingxiao
    Gu, Liyan
    Feng, Qianyuan
    Wu, Hao
    Yang, Linjun
    FUEL PROCESSING TECHNOLOGY, 2021, 218
  • [50] Operation of microalgal horizontal twin layer system for treatment of real wastewater and production of lipids
    Saleem, Sahar
    Zeshan
    Iftikhar, Rashid
    Arshad, Muhammad
    Zeeshan, Muhammad
    Hassan, Muhammad
    JOURNAL OF WATER PROCESS ENGINEERING, 2022, 48