Connection Knowledge System for the Assembly Sequence Planning

被引:0
|
作者
Yin Wensheng [1 ]
机构
[1] Huazhong Univ Sci & Technol, Sch Mech Sci & Engn, Wuhan 430074, Peoples R China
关键词
assembly design; assembly sequence planning; connection; knowledge system; HIERARCHICAL APPROACH;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The design process of product is a process that uses engineering connection knowledge to assemble each functional unit, and the essence of which is the application of assembly connection knowledge. In the development of assembly design system which based on the knowledge of engineering connection, the assembly sequence planning is considered, and a new method of design and application of knowledge system is put forward. Firstly, the basic engineering connection relationship is analyzed, and the Problem Oriented Analysis and Decision Expert System (POADES) method is used to construct the knowledge mainframe tree, and then the basic connection classes (namely the connection nodes) are determined to realize the mapping relationship between the assembly model and the mainframe tree of connection knowledge. Finally, in order to provide convenience for the assembly sequence planning, the map data and the assembly sequence planning data are attached to the nodes.
引用
收藏
页码:1356 / 1363
页数:8
相关论文
共 50 条
  • [31] A max-min ant colony system for assembly sequence planning
    Yu, Jiapeng
    Wang, Chengen
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 67 (9-12): : 2819 - 2835
  • [32] Domain knowledge based non-linear assembly sequence planning for furniture products
    Pan, Wanbin
    Wang, Yigang
    Chen, Xiao-Diao
    JOURNAL OF MANUFACTURING SYSTEMS, 2018, 49 : 226 - 244
  • [33] Knowledge-Based Approach to Assembly Sequence Planning for Wind-Driven Generator
    Wu, Meiping
    Zhao, Yi
    Wang, Chenxin
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2013, 2013
  • [34] A Script-driven Virtual Assembly Simulation System based on Assembly Sequence Concurrent Planning
    Hu, Xiaomei
    Zhu, Wenhua
    Yu, Tao
    Xiong, Zonghui
    2009 IEEE INTERNATIONAL CONFERENCE ON MECHATRONICS AND AUTOMATION, VOLS 1-7, CONFERENCE PROCEEDINGS, 2009, : 2478 - 2483
  • [35] Cyber-physical assembly system-based optimization for robotic assembly sequence planning
    Ying, Kuo-Ching
    Pourhejazy, Pourya
    Cheng, Chen-Yang
    Wang, Chi-Hsin
    JOURNAL OF MANUFACTURING SYSTEMS, 2021, 58 : 452 - 466
  • [36] A weighted assembly precedence graph for assembly sequence planning
    Wang, Yong
    Tian, De
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2016, 83 (1-4): : 99 - 115
  • [37] A weighted assembly precedence graph for assembly sequence planning
    Yong Wang
    De Tian
    The International Journal of Advanced Manufacturing Technology, 2016, 83 : 99 - 115
  • [38] A KNOWLEDGE-BASED PLANNING SYSTEM FOR MECHANICAL ASSEMBLY USING ROBOTS
    CHANG, KH
    WEE, WG
    IEEE EXPERT-INTELLIGENT SYSTEMS & THEIR APPLICATIONS, 1988, 3 (01): : 18 - &
  • [39] A hierarchical approach to assembly sequence planning
    Niu, X
    Ding, H
    Xiong, Y
    ICMA 2002 INTERNATIONAL CONFERENCE ON MANUFACTURING AUTOMATION, 2002, : 321 - 328
  • [40] A genetic algorithm for assembly sequence planning
    Del Valle, C
    Gasca, RM
    Toro, M
    Camacho, EF
    ARTIFICIAL NEURAL NETS PROBLEM SOLVING METHODS, PT II, 2003, 2687 : 337 - 344