Implementation of a Bottom-Hole Assembly Program

被引:4
|
作者
Bhalla, Kenneth [1 ]
Gong, Lixin [1 ]
McKown, George K. [2 ]
机构
[1] Stress Engn Serv Inc, Houston, TX 77041 USA
[2] Smith Int Inc, Houston, TX 77032 USA
关键词
D O I
10.1115/1.3000123
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
A state of the art graphical user interface program has been developed to predict and g. The techniques and design the bottom-hole assembly (BHA) performance for drillin algorithms developed in the program are based on those developed by Lubinski and Williamson. The BHA program facilitates conducting parametric studies and making field decisions for optimal BHA performance. The input parameters may include formation class, dip angle, hole size, drill collar size, number of stabilizers, and stabilizer spacing. The program takes into consideration bit-formation characteristics and interaction, drilling fluid weight, drill collar sizes, square collars, shock absorbers, measurement while drilling tools, reamer tools, directional tools, rotary steerable systems, etc. The output may consist of hole curvature (buildup or drop rate), hole angle, and weight on bit and is presented in drilling sentantics. Additionally, the program can perform mechanical analyses and can solve for the bending moments and reaction forces. Moreover; the program has the capability to predict the wellpath using a drill ahead algorithm. The program consists of a mathematical model that makes assumptions of 2D, static, and constant hole curvature, resulting in a robust computationally efficient tool that produces rapid reliable results. [DOI: 10.1115/1.3000123]
引用
收藏
页码:0431011 / 0431016
页数:6
相关论文
共 50 条
  • [21] RESULTS OF INDUSTRIAL-TESTING OF BOTTOM-HOLE DRILL STEM ASSEMBLY WITH PORTABLE CENTRALIZER
    SUKHANOV, VB
    BARABASHKIN, II
    POVALIKHIN, AS
    SOROKIN, AN
    NEFTYANOE KHOZYAISTVO, 1990, (04): : 15 - 17
  • [22] Optimizing Pendulum Bottom-Hole Assembly Based on New Straightening Capability Evaluation Index
    Chen, Zongqi
    Sun, Weihuang
    Li, Guangqiao
    Shi, Yucai
    CHEMISTRY AND TECHNOLOGY OF FUELS AND OILS, 2023, 59 (02) : 351 - 361
  • [23] Optimizing Pendulum Bottom-Hole Assembly Based on New Straightening Capability Evaluation Index
    Zongqi Chen
    Weihuang Sun
    Guangqiao Li
    Yucai Shi
    Chemistry and Technology of Fuels and Oils, 2023, 59 : 351 - 361
  • [24] Prediction model of build-up rate for bottom-hole assembly in rotary drilling
    Chen, Ran
    Huang, Wenjun
    Gao, Deli
    GEOENERGY SCIENCE AND ENGINEERING, 2025, 246
  • [25] A New Bottom-Hole Assembly Design Method to Maintain Verticality and Reduce Lateral Vibration
    Cheng, Zhong
    Zhang, Liang
    Hao, Zhouzheng
    Ding, Xiangxiang
    Liu, Zhikun
    Li, Tiantai
    PROCESSES, 2024, 12 (01)
  • [26] CALCULATION OF BOTTOM-HOLE PRESSURE IN GAS WELLS
    AZIZ, K
    JOURNAL OF PETROLEUM TECHNOLOGY, 1967, 19 (07): : 897 - &
  • [27] METHODS OF CRITICAL ZONE BOTTOM-HOLE PROCESSING
    KASYANCHUK, VG
    PILIPETS, IA
    NEFTYANOE KHOZYAISTVO, 1984, (09): : 53 - 55
  • [28] Recent development and use of bottom-hole choking
    Ross, JS
    TRANSACTIONS OF THE AMERICAN INSTITUTE OF MINING AND METALLURGICAL ENGINEERS, 1932, 98 : 332 - 341
  • [29] BOTTOM-HOLE TREATMENT TESTING OF MICELLAR SOLUTIONS
    GORBUNOV, AT
    ZHDANOV, SA
    SURGUCHEV, ML
    SURINA, VV
    NEFTYANOE KHOZYAISTVO, 1988, (11): : 38 - 40
  • [30] BOTTOM-HOLE FILTRATION AT A POSITIVE DIFFERENTIAL PRESSURE
    SVALOV, AM
    SOVIET MINING SCIENCE USSR, 1989, 25 (01): : 56 - 60