共 50 条
- [34] Petri Net Modeling and Real-Time Control of Dual-Arm Cluster Tools with Residency Time Constraint and Activity Time Variations 2008 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING, VOLS 1 AND 2, 2008, : 109 - +
- [36] Efficient Approach to Failure Response of Process Module in Dual-Arm Cluster Tools With Wafer Residency Time Constraints IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2021, 51 (03): : 1612 - 1629
- [37] Petri Net-Based Polynomially Complex Approach to Optimal One-Wafer Cyclic Scheduling of Hybrid Multi-Cluster Tools in Semiconductor Manufacturing IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2014, 44 (12): : 1598 - 1610
- [39] Simulation Modeling and Visualization of Start-up Transient Processes of Dual-arm Cluster Tools with Wafer Revisiting 2014 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN AND CYBERNETICS (SMC), 2014, : 133 - 138
- [40] Optimal Scheduling of Time-Constrained Single-arm Cluster Tools with Wafer Revisiting 2016 13TH INTERNATIONAL WORKSHOP ON DISCRETE EVENT SYSTEMS (WODES), 2016, : 355 - 360