Optimizing work zones for two-lane highway maintenance projects

被引:49
|
作者
Chien, S [1 ]
Tang, YM [1 ]
Schonfeld, P [1 ]
机构
[1] New Jersey Inst Technol, Dept Civil & Environm Engn, Newark, NJ 07102 USA
关键词
optimization; workspace; highway maintenance; scheduling; costs;
D O I
10.1061/(ASCE)0733-947X(2002)128:2(145)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Highway maintenance is very expensive in terms of not only costs to the responsible agencies but also disruptive delays to users. Construction and maintenance activities on two-lane two-way highways often require the closure of one lane. During certain periods of a day, the user delay associated with lane closure may be quite intolerable to motorists. A numerical method is developed to optimize work-zone scheduling and traffic control on two-lane two-way highways where one lane at a time is closed. The objective is to minimize the total cost, including maintenance, labor/equipment idle, and user-delay costs, considering traffic flows varying over time. The optimized variables (e.g., work-zone lengths and cycle times) and the sensitivity results generated from a numerical example are presented in this study.
引用
收藏
页码:145 / 155
页数:11
相关论文
共 50 条
  • [31] Overtaking Safety Evaluation and Setting of Auxiliary Lane on Two-Lane Highway in China
    Cheng, Guozhu
    Wu, Lixin
    Xu, Liang
    Qin, Lihui
    Wang, Yuxia
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2016, 2016
  • [32] Study on Aggression of Lane-changing on Two-lane Highway including a Bus
    Yi, Yi
    Li, Zhipeng
    ADVANCES IN COMPUTATIONAL MODELING AND SIMULATION, PTS 1 AND 2, 2014, 444-445 : 743 - 747
  • [33] Using the rural two-lane highway draft prototype chapter
    Fitzpatrick, Kay
    Schneider, William
    Carvell, Jim
    STATISTICAL METHODS AND CRASH PREDICTION MODELING, 2006, (1950): : 44 - 54
  • [34] Research on Speed Limit of Two-lane Highway of Mountain Area
    Kan, Yuheng
    Qiu, Xin
    Shen, Xiang
    Yang, Qing
    Zhang, Leyi
    SUSTAINABLE ENVIRONMENT AND TRANSPORTATION, PTS 1-4, 2012, 178-181 : 1904 - 1907
  • [35] Two-Lane Highway Capacity Estimation Based on Geometric Features
    Vijay, B. G.
    Al-Mansour, Abdullah
    Lee, Kang-Won Wayne
    CIVIL AND ENVIRONMENTAL ENGINEERING, 2023, 19 (01) : 190 - 205
  • [36] Traffic states induced by slowdown sections on two-lane highway
    Hanaura, Hirotoshi
    Masukura, Shuichi
    Nagatani, Takashi
    PHYSICA A-STATISTICAL MECHANICS AND ITS APPLICATIONS, 2009, 388 (07) : 1196 - 1206
  • [37] Improved Operational Performance Assessment for Two-Lane Highway Facilities
    Li, Jing
    Washburn, Scott S.
    JOURNAL OF TRANSPORTATION ENGINEERING, 2014, 140 (06)
  • [38] Accident two-lane mitigation on two-lane highways
    Fitzpatrick, K
    Harwood, DW
    Potts, IB
    ITE JOURNAL-INSTITUTE OF TRANSPORTATION ENGINEERS, 2002, 72 (04): : 42 - 44
  • [39] Modification of the Highway Capacity Manual two-lane highway analysis procedure for Spanish conditions
    Moreno, Ana T.
    Llorca, Carlos
    Washburn, Scott S.
    Bessa, Jose E.
    Hale, David K.
    Garcia, Alfredo
    JOURNAL OF ADVANCED TRANSPORTATION, 2016, 50 (08) : 1650 - 1665
  • [40] Design and marking criteria for passing zones in two-lane highways
    Criterios para el diseño y señalización de zonas de adelantamiento en carreteras convencionales
    1600, Asociacion Espanola de la Carretera (04):