Optimizing work zones for two-lane highway maintenance projects

被引:49
|
作者
Chien, S [1 ]
Tang, YM [1 ]
Schonfeld, P [1 ]
机构
[1] New Jersey Inst Technol, Dept Civil & Environm Engn, Newark, NJ 07102 USA
关键词
optimization; workspace; highway maintenance; scheduling; costs;
D O I
10.1061/(ASCE)0733-947X(2002)128:2(145)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Highway maintenance is very expensive in terms of not only costs to the responsible agencies but also disruptive delays to users. Construction and maintenance activities on two-lane two-way highways often require the closure of one lane. During certain periods of a day, the user delay associated with lane closure may be quite intolerable to motorists. A numerical method is developed to optimize work-zone scheduling and traffic control on two-lane two-way highways where one lane at a time is closed. The objective is to minimize the total cost, including maintenance, labor/equipment idle, and user-delay costs, considering traffic flows varying over time. The optimized variables (e.g., work-zone lengths and cycle times) and the sensitivity results generated from a numerical example are presented in this study.
引用
收藏
页码:145 / 155
页数:11
相关论文
共 50 条
  • [1] Optimizing Work Zones for Two-Lane Urban Road Maintenance Projects
    黄谦
    石京
    TsinghuaScienceandTechnology, 2008, (05) : 644 - 650
  • [2] Optimizing Work Zones for Two-Lane Urban Road Maintenance Projects
    Huang, Qian
    Shi, Jing
    Tsinghua Science and Technology, 2008, 13 (05) : 644 - 650
  • [3] Work zone optimization for two-lane highway maintenance projects.
    Chen, CH
    Schonfeld, P
    MAINTENANCE MANAGEMENT AND SERVICES, 2004, (1877): : 95 - 105
  • [4] Queueing delay models for two-lane highway work zones
    Son, YT
    TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 1999, 33 (07) : 459 - 471
  • [5] Estimating motorist delay at two-lane highway work zones
    Cassidy, Michael J.
    Son, YoungTae
    Rosowsky, David V.
    1600, Pergamon Press Inc, Tarrytown, NY, United States (28):
  • [6] Developing a model for estimating delay at two-lane highway work zones
    Young-Tae Son
    KSCE Journal of Civil Engineering, 1999, 3 (2) : 81 - 88
  • [7] Control Strategy Optimization for Two-Lane Highway Lane-Closure Work Zones
    Hua, Xuedong
    Wang, YinHai
    Yu, Weijie
    Zhu, Wenbo
    Wang, Wei
    SUSTAINABILITY, 2019, 11 (17)
  • [8] Work zone optimization for two-lane highway resurfacing projects with an alternate route
    Chen, CH
    Schonfeld, P
    Paracha, J
    MAINTENANCE MANAGEMENT AND OPERATIONS SERVICES, 2005, (1911): : 51 - 66
  • [9] Modeling and Operational Performance Evaluation of Driveway Assistance Devices for Lane Closures on Two-Lane Highway Work Zones
    Haque, M. M. Shakiul
    Khattak, Aemal J.
    Zhao, Li
    JOURNAL OF TRANSPORTATION ENGINEERING PART A-SYSTEMS, 2025, 151 (03)
  • [10] A simulation model for two-lane urban work zones
    Kaisar, EI
    Haghani, A
    Panchamgam, K
    6TH WORLD MULTICONFERENCE ON SYSTEMICS, CYBERNETICS AND INFORMATICS, VOL XVI, PROCEEDINGS: COMPUTER SCIENCE III, 2002, : 241 - 246