Analysis of the construction process of cable-stayed bridges built on temporary supports

被引:34
|
作者
Lozano-Galant, J. A. [1 ]
Paya-Zaforteza, I. [2 ]
Xu, D. [3 ]
Turmo, J. [4 ]
机构
[1] Univ Castilla La Mancha, Dept Civil Engn, E-13071 Ciudad Real, Spain
[2] Univ Politecn Valencia, Inst Ciencia & Tecnol Hormigon ICITECH, Dept Ingn Construcc & Proyectos Ingn Civil, Valencia 46023, Spain
[3] Tongji Univ, Dept Bridge Engn, Shanghai 200092, Peoples R China
[4] Univ Politecn Cataluna, BarcelonaTech, Dept Construct Engn, ES-08034 Barcelona, Spain
关键词
Cable-stayed bridges; Construction process; Temporary supports erection method; Backward modeling;
D O I
10.1016/j.engstruct.2012.02.005
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The temporary supports erection method is a fast and economical way of building cable-stayed bridges. In this method the bridge deck is first erected on a set of temporary and permanent supports and then, the stays are successively placed and tensioned according to a predefined tensioning sequence. A proper definition and analysis of this sequence is very complex as the structure is highly statically indeterminate, exhibits a non linear behavior and has a changing static scheme. Despite its importance, no specific research referring to the modeling of the temporary support erection method has been found as most of the modeling procedures are proposed for the alternative erection technique, the cantilever erection method. The modeling carried out by most of these methods is based on the opposite construction sequence followed on site, this is to say, the structure is disassembled from the desired final stage (Objective Completion Stage, OCS). A procedure, the Backward Algorithm (BA), is formally presented in this paper for calculation of the erection of cable-stayed bridges built on temporary supports. Because of its simplicity the BA can be reproduced by any structural code that enables the modeling of the prestresses of the stays by means of imposed strains or imposed temperature increments. Another advantage is that no separate models are needed to calculate the evolution of stresses in the strands when the strand by strand tensioning technique is used. Furthermore, the stay elongations when prestressed can be easily obtained when the stays are prestressed in a single operation or strand by strand. This information is important to control the correct and safe prestressing of the stay on site. In addition, it also help the designer to control if the anchor wedge bites the strand in the same position several times during the prestressing process. (C) 2012 Elsevier Ltd. All rights reserved.
引用
收藏
页码:95 / 106
页数:12
相关论文
共 50 条
  • [21] STIFFNESS ANALYSIS OF CABLE-STAYED BRIDGES
    LAZAR, BE
    JOURNAL OF THE STRUCTURAL DIVISION-ASCE, 1974, 100 (NST2): : 467 - 467
  • [22] AEROELASTIC ANALYSIS OF CABLE-STAYED BRIDGES
    SCANLAN, RH
    JONES, NP
    JOURNAL OF STRUCTURAL ENGINEERING-ASCE, 1990, 116 (02): : 279 - 297
  • [23] Innovative Method for the Construction of Cable-Stayed Bridges by Cable Crane
    Yu, Xiangmin
    Chen, Dewei
    STRUCTURAL ENGINEERING INTERNATIONAL, 2018, 28 (04) : 498 - 505
  • [24] Construction sequence analysis of long-span cable-stayed bridges
    Granata, Michele Fabio
    Longo, Giuseppe
    Recupero, Antonino
    Arici, Marcello
    ENGINEERING STRUCTURES, 2018, 174 : 267 - 281
  • [25] Construction stage analysis of three-dimensional cable-stayed bridges
    Atmaca, Barbaros
    Ates, Sevket
    STEEL AND COMPOSITE STRUCTURES, 2012, 12 (05): : 413 - 426
  • [26] Structural stability of cable-stayed bridges during construction
    Hong-Jung Kim
    Deok Hee Won
    Young-Jong Kang
    Seungjun Kim
    International Journal of Steel Structures, 2017, 17 : 443 - 469
  • [27] Construction stages of cable-stayed bridges with composite deck
    Granata, M. F.
    Margiotta, P.
    Arici, M.
    Recupero, A.
    BRIDGE STRUCTURES, 2012, 8 (3-4) : 93 - 106
  • [28] Nonlinear stability analysis of cable-stayed bridges in cantilever construction state
    Pan, Jiajun
    Lu, Wei
    Tang, Xiaobing
    Wuhan Ligong Daxue Xuebao (Jiaotong Kexue Yu Gongcheng Ban)/Journal of Wuhan University of Technology (Transportation Science and Engineering), 2008, 32 (02): : 225 - 228
  • [29] CONSTRUCTION OF LONG CABLE-STAYED BRIDGES IN JAPAN.
    Nonaka, Koji
    Yasumatsu, Toshio
    Annual Report of Roads, 1985, : 19 - 27
  • [30] Structural stability of cable-stayed bridges during construction
    Kim, Hong-Jung
    Won, Deok Hee
    Kang, Young-Jong
    Kim, Seungjun
    INTERNATIONAL JOURNAL OF STEEL STRUCTURES, 2017, 17 (02) : 443 - 469