共 50 条
- [42] Seismic response analysis of cross metro transfer station structure Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2019, 41 (07): : 1227 - 1234
- [45] A true 3D physical model test study on the stability of an underground cavern group in Shuangjiangkou Hydropower Station FOURTH INTERNATIONAL CONFERENCE ON EXPERIMENTAL MECHANICS, 2010, 7522
- [47] Stability analysis of determined blocks in the underground powerhouse of guandi hydropower station ADVANCES IN DISCONTINUOUS NUMERICAL METHODS AND APPLICATIONS IN GEOMECHANICS AND GEOENGINEERING, 2012, : 219 - 225
- [48] Influence of rock temperature on stress in the spiral casing structure of the underground hydropower station COMPUTER METHODS AND ADVANCES IN GEOMECHANICS, VOL 2, 1997, : 1501 - 1505
- [49] Interval analysis method of safety degree for mid partition in underground multi-cavern structure Yantu Lixue/Rock and Soil Mechanics, 2010, 31 (06): : 1847 - 1852