共 42 条
- [31] DESIGN AND CONSTRUCTION OF SOME UNDERGROUND STATIONS FOR HONG-KONG MASS TRANSIT RAILWAY SYSTEM STRUCTURAL ENGINEER-PART A, 1978, 56 (01): : 11 - 20
- [33] HONG-KONG MASS TRANSIT RAILWAY MODIFIED INITIAL SYSTEM - DESIGN AND CONSTRUCTION OF THE DRIVEN TUNNELS AND THE IMMERSED TUBE PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1980, 68 (NOV): : 627 - 655
- [35] HONG-KONG MASS TRANSIT RAILWAY MODIFIED INITIAL SYSTEM - DESIGN AND CONSTRUCTION OF ABOVE-GROUND WORKS AND TRACKWORK PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1980, 68 (NOV): : 657 - 688
- [36] HONG-KONG MASS TRANSIT RAILWAY MODIFIED INITIAL SYSTEM - DESIGN AND CONSTRUCTION OF UNDERGROUND STATIONS AND CUT-AND-COVER TUNNELS PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1980, 68 (NOV): : 599 - 626
- [38] Effective loadflow technique with non-constant MVA load for the Hong Kong Mass Transit Railway Urban Lines power distribution system FOURTH INTERNATIONAL CONFERENCE ON ADVANCES IN POWER SYSTEM CONTROL, OPERATION & MANAGEMENT, VOLS 1 AND 2, 1997, : 753 - 757