MAKASSAR SMART CITY OPERATION CENTER PRIORITY OPTIMIZATION USING FUZZY MULTI-CRITERIA DECISION-MAKING

被引:0
|
作者
Kurniawan, Fachrul [1 ,2 ]
Wibawa, Aji Prasetya [3 ]
Munir [4 ]
Nugroho, Supeno Mardi Susiki [1 ]
Hariadi, Mochamad [1 ]
机构
[1] Inst Teknol Sepuluh Nopember ITS, Dept Elect Engn, Surabaya, Indonesia
[2] Maulana Malik Ibrahim Malang Islamic State Univ M, Dept Informat Engn, Malang, Indonesia
[3] Univ Negeri Malang, Elect Engn, Malang, Indonesia
[4] Univ Pendidikan Indonesia, Comp Sci, Bandung, Indonesia
关键词
Project optimization; smart operation room; main priority; fuzzy MCDM; RESOURCES;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The development of smart city operation room of Makassar possesses several equally important stages which are equally important. There are four stages of development that are 1) data center construction, 2) camera distribution around the city, 3) wall room monitoring construction, and 4) smart operation room architecture construction. Since the time and cost are limited, it forces the project manager to be able to manage and control the priority in conducting the project. There are several usable criteria to determine the priority in conducting the project development through criteria consideration of the entire project stages. Project priority optimization system aims at making every single project activity effective including its evaluation process. It also exposes a ranking illustration of foremost project priority by providing cost preference of the entire development stages. Fuzzy Multi-Criteria Decision-Making is used to illustrate the project priority rank and further to determine the alternative optimal option in conducting the project. This enforces particular project to allocate its cost to the project with a higher level of cost necessity. The company, therefore, enables to make effective funding for the entire project based on the level of importance and time achievement and subsequently it promotes accessible technology integration. The conducted experiment suggests that the first construction of the project is data center construction followed by wall room construction and CCTV distribution. This is relevant with optimization value result of data center 0,405 higher than A2 0,42 for wall room construction and A3 CCTV distribution 0,24.
引用
收藏
页码:285 / 289
页数:5
相关论文
共 50 条