Training and assignment of multi-skilled workers for implementing seru production systems

被引:90
|
作者
Liu, ChenGuang [1 ,2 ]
Yang, Na [1 ]
Li, WenJuan [1 ]
Lian, Jie [1 ]
Evans, Steve [2 ]
Yin, Yong [1 ,3 ]
机构
[1] Xian Univ Technol, Sch Econ & Management, Xian 710048, Peoples R China
[2] Univ Cambridge, Inst Mfg, Cambridge CB3 0FS, England
[3] Yamagata Univ, Dept Econ & Business Management, Yamagata 9908560, Japan
基金
中国国家自然科学基金;
关键词
Seru production system; Training of multi-skilled workers; Multi-skilled workers assignment; Reconfiguration of production systems; Heuristic algorithm; CONVEYOR ASSEMBLY-LINE; OPERATOR ALLOCATION; LABOR ASSIGNMENT; FLEXIBILITY; MODEL; INNOVATION;
D O I
10.1007/s00170-013-5027-5
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Confronted with high variety and low volume market demands, many companies, especially the Japanese electronics manufacturing companies, have reconfigured their conveyor assembly lines and adopted seru production systems. Seru production system is a new type of work-cell-based manufacturing system. A lot of successful practices and experience show that seru production system can gain considerable flexibility of job shop and high efficiency of conveyor assembly line. In implementing seru production, the multi-skilled worker is the most important precondition, and some issues about multi-skilled workers are central and foremost. In this paper, we investigate the training and assignment problem of workers when a conveyor assembly line is entirely reconfigured into several serus. We formulate a mathematical model with double objectives which aim to minimize the total training cost and to balance the total processing times among multi-skilled workers in each seru. To obtain the satisfied task-to-worker training plan and worker-to-seru assignment plan, a three-stage heuristic algorithm with nine steps is developed to solve this mathematical model. Then, several computational cases are taken and computed by MATLAB programming. The computation and analysis results validate the performances of the proposed mathematical model and heuristic algorithm.
引用
收藏
页码:937 / 959
页数:23
相关论文
共 44 条
  • [21] Eco-friendly multi-skilled worker assignment and assembly line balancing problem
    Liu, Rongfan
    Liu, Ming
    Chu, Feng
    Zheng, Feifeng
    Chu, Chengbin
    COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 151
  • [22] Dynamic assignment of a multi-skilled workforce in job shops: An approximate dynamic programming approach
    Annear, Luis Mauricio
    Akhavan-Tabatabaei, Raha
    Schmid, Verena
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2023, 306 (03) : 1109 - 1125
  • [23] IT Project Portfolio Scheduling and Multi-skilled Staff Assignment with Ant Colony Optimization Algorithm
    Chen, Rong
    Liang, Changyong
    Gu, Dongxiao
    FIFTEENTH WUHAN INTERNATIONAL CONFERENCE ON E-BUSINESS, 2016, : 505 - 514
  • [24] Contextual factors influencing the delegation of tasks to Multi-skilled Community Health Workers in Haiti
    Coulibaly, Gneninfolo Lazar
    Farand, Lambert
    Champagne, Francois
    SANTE PUBLIQUE, 2023, 35 (02): : 182 - 192
  • [25] A HYBRID SIMULATION APPROACH TO DYNAMIC MULTI-SKILLED WORKFORCE PLANNING OF PRODUCTION LINE
    Feng, Yuan
    Fan, Wenhui
    PROCEEDINGS OF THE 2014 WINTER SIMULATION CONFERENCE (WSC), 2014, : 1632 - 1643
  • [26] Bi-objective Genetic Algorithm for Heterogeneous Multi-Skilled Human Resources Assignment and Project Scheduling
    Li, Ming
    Zhou, Ying
    2015 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING, MSE 2015, 2015, : 232 - 238
  • [27] Minimizing average project team size given multi-skilled workers with heterogeneous skill levels
    Walter, Matthias
    Zimmermann, Juergen
    COMPUTERS & OPERATIONS RESEARCH, 2016, 70 : 163 - 179
  • [28] Climate adaptation plans and "green jobs": challenges for implementing a responsive, multi-skilled workforce in Worcester, Massachusetts
    Bhat, Varun
    Strauss, Sarah
    FRONTIERS IN SOCIOLOGY, 2025, 10
  • [29] Multiobjective optimization allocation of multi-skilled workers considering the skill heterogeneity and time-varying effects in unit brake production lines
    Zeng, Huiqin
    Nie, Sen
    ENGINEERING REPORTS, 2024, 6 (05)
  • [30] Multi-Objective Advantage Actor-Critic Algorithm for Hybrid Disassembly Line Balancing with Multi-Skilled Workers
    Wang, Jiacun
    Xi, Guipeng
    Guo, Xiwang
    Qin, Shujin
    Han, Henry
    INFORMATION, 2024, 15 (03)