共 50 条
- [21] Studies of Development Methods for Improving Mining Equipment and Processes with Case Histories from Hard Coal Mining. Berg- und Huettenmaennische Monatshefte, 1985, 130 (12): : 460 - 468
- [23] Development of a Wind Turbine Test Rig and Rotor for Trailing Edge Flap Investigation: Static Flap Angles Case SCIENCE OF MAKING TORQUE FROM WIND 2014 (TORQUE 2014), 2014, 524
- [25] Development of an energy analysis for strip coal mining. Part III: Procedure for evaluating the energy intensity of technological processes Journal of Mining Science, 1998, 34 : 518 - 528
- [26] Metallurgical Test Work for Process Development - A Case Study of the Prospero Orebody TENTH MILL OPERATORS CONFERENCE 2009, PROCEEDINGS, 2009, (11): : 63 - 68
- [27] Test and development process retrospective - a case study using ODC triggers INTERNATIONAL CONFERENCE ON DEPENDABLE SYSTEMS AND NETWORKS, PROCEEDINGS, 2002, : 669 - 678
- [28] Evaluation of the Online Assessment Test using Process Mining (Case Study: Intensive English Center) 2015 3RD INTERNATIONAL CONFERENCE ON INFORMATION AND COMMUNICATION TECHNOLOGY (ICOICT), 2015, : 472 - 477
- [29] Static and dynamic response characteristics of a TBM cutterhead's rock-breaking process: a case study of a diversion project Xia, Yimin (xiaymj@mail.csu.edu.cn), 1600, Editorial Board of Journal of Harbin Engineering (37): : 732 - 737
- [30] Development of energy analysis of open coal mining. Part. III: Estimation procedure of power intensity of technological processes Teshugang/Special Steel, 1998, 19 (06): : 60 - 73