Integrated flood management for Beiyun River, China

被引:4
|
作者
Chen, Minghong [1 ]
Fang, Hongwei [2 ]
Zheng, Yi [2 ]
He, Guojian [2 ]
机构
[1] China Agr Univ, Coll Water Resources & Civil Engn, Beijing 100084, Peoples R China
[2] Tsinghua Univ, State Key Lab Hydrosci & Engn, Beijing 100084, Peoples R China
基金
中国国家自然科学基金;
关键词
Rainstorm; Hydrological model; Hydrodynamic model; Hydraulic model; Water resources; Dams and floodgates; WATER;
D O I
10.2478/johh-2013-0023
中图分类号
TV21 [水资源调查与水利规划];
学科分类号
081501 ;
摘要
Beiyun River Basin is holistically suffering a water shortage and relatively concentrated flood risk. The current operation (level-control) of dams and floodgates, which is in passive defense mode, cannot meet the demands of both flood control and storm water resources. An integrated flood forecasting and management system is developed by the connecting of the hydrological model and hydrodynamic model and coupling of the hydrodynamic model and hydraulic model for dams and floodgates. Based upon the forecasted runoff processes, a discharge-control operation mode of dams and floodgates is proposed to be utilized in order to well regulate the flood routing in channels. The simulated water level, discharge, and water storage volume under different design conditions of rainfall return periods and floodgates operation modes are compared. The results show that: (1) for small floods, current operation modes can satisfy the objectives, but discharge-control operation can do better; (2) for medium size floods, since pre-storing of the floods affects the discharge of follow-up floods by floodgates, the requirement of flood control cannot be satisfied under current operations, but the discharge-control operation can; (3) for large floods, neither operation can meet the requirement because of the limited storage of these dams. Then, the gravel pits, wetlands, ecological lakes and flood detention basins around the river must be used for excess flood waters. Using the flood forecasting and management system can change passive defense to active defense mode, solving the water resources problem of Beijing city and Beiyun River Basin to a certain extent.
引用
收藏
页码:177 / 187
页数:11
相关论文
共 50 条
  • [31] Correction to: An Integrated Modelling Approach for Flood Simulation in the Urbanized Qinhuai River Basin, China
    Runjie Li
    Jinkang Du
    Guodong Bian
    Yuefeng Wang
    Changchun Chen
    Xueliang Zhang
    Maohua Li
    Shanshan Wang
    Senyao Wu
    Shunping Xie
    Long Yang
    Chong-Yu Xu
    Water Resources Management, 2020, 34 : 3985 - 3985
  • [32] Evaluating surface water quality using water quality index in Beiyun River, China
    Wu, Huihui
    Yang, Wenjie
    Yao, Ruihua
    Zhao, Yue
    Zhao, Yunqiang
    Zhang, Yuhang
    Yuan, Qianhui
    Lin, Aijun
    ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2020, 27 (28) : 35449 - 35458
  • [33] Integrated Water Resource Management for the Yellow River Basin in China
    Li, Rongchao
    van Beek, Eelco
    PROCEEDINGS OF THE 1ST INTERNATIONAL YELLOW RIVER FORUM ON RIVER BASIN MANAGEMENT, VOL I, 2003, : 122 - 132
  • [34] Integrated flood management system
    Kolovopoulos, P., 1600, (32):
  • [35] Ecosystem health of the Beiyun River basin (Beijing, China) as evaluated by the method of combination of AHP and PCA
    Yuan, Qianhui
    Wu, Huihui
    Zhao, Yunqiang
    Zhang, Yuhang
    Yao, Ruihua
    Zhao, Yue
    Yang, Wenjie
    ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2022, 29 (26) : 39116 - 39130
  • [36] An integrated approach to flood risk management and spatial quality for a Netherlands' river polder area
    Nillesen, Anne Loes
    Kok, Matthijs
    MITIGATION AND ADAPTATION STRATEGIES FOR GLOBAL CHANGE, 2015, 20 (06) : 949 - 966
  • [37] An integrated approach to flood risk management and spatial quality for a Netherlands’ river polder area
    Anne Loes Nillesen
    Matthijs Kok
    Mitigation and Adaptation Strategies for Global Change, 2015, 20 : 949 - 966
  • [38] INTEGRATED RIVER SYSTEM OPERATION IN A MAJOR FLOOD
    CALVERT, JD
    JOURNAL OF THE POWER DIVISION-ASCE, 1976, 102 (02): : 232 - 233
  • [39] INTEGRATED RIVER SYSTEM OPERATION IN A MAJOR FLOOD
    COOPER, AJ
    ROBERTS, CA
    JOURNAL OF THE POWER DIVISION-ASCE, 1976, 102 (01): : 63 - 80
  • [40] INTEGRATED RIVER SYSTEM OPERATIONS IN A MAJOR FLOOD
    COOPER, AJ
    ROBERTS, CA
    JOURNAL OF THE POWER DIVISION-ASCE, 1977, 103 (01): : 80 - 81