DISCOUNTING PROCEDURES IN LARGE ENGINEERING PROJECTS

被引:0
|
作者
Malik, Arif S. [1 ]
机构
[1] Sultan Qaboos Univ, Coll Engn, Al Khoud, Oman
关键词
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In economic analysis of any engineering project discounting is a standard procedure used in cost-benefit analysis. With careful selection of the assumptions used in cost-benefit analysis it can be made to support, or oppose, almost anything. This is particularly so when the decision being studied involves some cost or benefit, for which there is no market price or which, because of an externality, is not fully reflected in the market price. Typical examples would be a project to build a hydroelectric dam in an area of outstanding natural beauty or a law to require factories to limit emissions of gases that may cause ill-health. Discounting tends to give less weight to future costs and benefits. The future environmental costs are either ignored or given less weight due to discounting in the economic analysis. This paper argues against using the practice of discounting and shows that both the time preference and the opportunity cost of capital arguments, used to justify discounting, are in conflict when we take the holistic approach to the environment.
引用
收藏
页码:677 / 682
页数:6
相关论文
共 50 条
  • [41] Considerations regarding System Engineering in Large scale projects with heterogeneous contexts
    Cremonini, A.
    Caiazzo, M.
    Hayden, D.
    Labate, M. G.
    Oulgin, R.
    Santander-Vela, J.
    MODELING, SYSTEMS ENGINEERING, AND PROJECT MANAGEMENT FOR ASTRONOMY VII, 2016, 9911
  • [42] Enhancing Accessibility in Software Engineering Projects with Large Language Models (LLMs)
    Aljedaani, Wajdi
    Eler, Marcelo Medeiros
    Parthasarathy, P. D.
    PROCEEDINGS OF THE 56TH ACM TECHNICAL SYMPOSIUM ON COMPUTER SCIENCE EDUCATION, SIGCSE TS 2025, VOL 1, 2025, : 25 - 31
  • [43] Key risks in the supply chain of large scale engineering and construction projects
    Rudolf, Christian A.
    Spinler, Stefan
    SUPPLY CHAIN MANAGEMENT-AN INTERNATIONAL JOURNAL, 2018, 23 (04) : 336 - 350
  • [44] Geomorphological analogues for large estuarine engineering projects: A case study of barrages, causeways and tidal energy projects
    Morris, Roger K. A.
    OCEAN & COASTAL MANAGEMENT, 2013, 79 : 52 - 61
  • [46] Enhancing Accessibility in Software Engineering Projects with Large Language Models (LLMs)
    Aljedaani, Wajdi
    Eler, Marcelo Medeiros
    Parthasarathy, P. D.
    PROCEEDINGS OF THE 56TH ACM TECHNICAL SYMPOSIUM ON COMPUTER SCIENCE EDUCATION, SIGCSE TS 2025, VOL 2, 2025, : 25 - 31
  • [47] A comparison of two algorithms in computerized temporal discounting procedures
    Kowal, Benjamin P.
    Yi, Richard
    Erisman, Amanda C.
    Bickel, Warren K.
    BEHAVIOURAL PROCESSES, 2007, 75 (02) : 231 - 236
  • [48] Temporal Discounting in Software Engineering: A Replication Study
    Fagerholm, Fabian
    Becker, Christoph
    Chatzigeorgiou, Alexander
    Betz, Stefanie
    Duboc, Leticia
    Penzenstadler, Birgit
    Mohanani, Rahul
    Venters, Colin C.
    2019 13TH ACM/IEEE INTERNATIONAL SYMPOSIUM ON EMPIRICAL SOFTWARE ENGINEERING AND MEASUREMENT (ESEM 2019), 2019, : 162 - 173
  • [49] Estimation of Work Transformation Matrices for Large-Scale Concurrent Engineering Projects
    Schlick, Christopher M.
    Schneider, Sebastian
    Duckwitz, Soenke
    RISK AND CHANGE MANAGEMENT IN COMPLEX SYSTEMS, 2014, : 211 - 221
  • [50] Discounting and risk adjusting non-marginal investment projects
    Gollier, Christian
    EUROPEAN REVIEW OF AGRICULTURAL ECONOMICS, 2011, 38 (03) : 325 - 334