Capacity planning and resource allocation in assembly systems consisting of dedicated and reconfigurable lines

被引:16
|
作者
Gyulai, David [1 ,2 ]
Kadar, Botond [1 ]
Monostori, Laszlo [1 ,2 ]
机构
[1] Hungarian Acad Sci, Inst Comp Sci & Control, Fraunhofer Project Ctr Prod Management & Informat, H-1111 Budapest, Hungary
[2] Budapest Univ Technol & Econ, Dept Mfg Scence & Technol, H-1111 Budapest, Hungary
关键词
Capacity planning; Reconfigurable assembly systems; Machine learning; MANUFACTURING SYSTEMS;
D O I
10.1016/j.procir.2014.10.028
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Companies with diverse product portfolio often face capacity planning problems due to the diversity of the products and the fluctuation of the order stream. High volume products can be produced cost-efficiently in dedicated assembly lines, but the assembly of low-volume products in such lines involves high idle times and operation costs. Reconfigurable assembly lines offer reasonable solution for the problem; however, it is still complicated to identify the set of products which are worth to assemble in such a line instead of dedicated ones. In the paper a novel method is introduced that supports the long-term decision to relocate the assembly of a product with decreasing demand from a dedicated to a reconfigurable line, based on the calculated investment and operational costs. In order to handle the complex aspects of the planning problem a new approach is proposed that combines discrete-event simulation and machine learning techniques. The feasibility of the approach is demonstrated through the results of an industrial case study. (C) 2014 The Authors. Published by Elsevier B.V.
引用
收藏
页码:185 / 191
页数:7
相关论文
共 50 条
  • [41] Reverse Link Erlang Capacity of OFDMA Wireless Systems with Adaptive Resource Allocation
    Zhang, Beilei
    Iyer, Ramesh
    Kiasaleh, Kamran
    2006 IEEE WIRELESS COMMUNICATIONS AND NETWORKING CONFERENCE (WCNC 2006), VOLS 1-4, 2006, : 2106 - 2109
  • [42] Integrated Production Program and Human Resource Allocation Planning of Sequenced Production Lines with Simulated Assessment
    Maerz, Lothar
    Tutsch, Hansjoerg
    Auer, Stefan
    Sihn, Wilfried
    ADVANCED MANUFACTURING AND SUSTAINABLE LOGISTICS, PROCEEDINGS, 2010, 46 : 408 - +
  • [43] ECONOMIC ANALYSIS FOR EDUCATION PLANNING - RESOURCE ALLOCATION IN NONMARKET SYSTEMS - FOX,KA
    CYERT, RM
    JOURNAL OF ECONOMIC LITERATURE, 1973, 11 (02) : 592 - 593
  • [44] ECONOMIC ANALYSIS FOR EDUCATIONAL PLANNING - RESOURCE ALLOCATION IN NONMARKET SYSTEMS - FOX,KA
    MANESCHI, A
    KYKLOS, 1974, 27 (02) : 405 - 407
  • [45] Retraction Note to: Effect of reconfiguration costs on planning for capacity scalability in reconfigurable manufacturing systems
    Hans-Otto Günther
    Flexible Services and Manufacturing Journal, 2014, 26 : 609 - 609
  • [46] RETRACTED ARTICLE: Effect of reconfiguration costs on planning for capacity scalability in reconfigurable manufacturing systems
    Ahmed M. Deif
    Waguih ElMaraghy
    International Journal of Flexible Manufacturing Systems, 2006, 18 : 225 - 238
  • [47] Cooperative capacity planning and resource allocation by mutual outsourcing using ant algorithm in a decentralized supply chain
    Wang, Kung-Jeng
    Chen, M-J
    EXPERT SYSTEMS WITH APPLICATIONS, 2009, 36 (02) : 2831 - 2842
  • [48] Digital planning of symbiotic assembly systems. Integration of electrified trucks in existing assembly lines of conventional trucks
    Voit, Patrick
    Voringer, Bernhard
    Neuhäuser, Thomas
    Hohmann, Andrea
    Reinhart, Gunther
    WT Werkstattstechnik, 2020, 110 (03): : 119 - 124
  • [49] Operation planning based on a genetic algorithm for multi-model assembly lines considering worker change in allocation
    Weng, JiaHua
    Onari, Hisashi
    Journal of Japan Industrial Management Association, 2008, 59 (04) : 304 - 311
  • [50] Resource Sharing in Cognitive Radio Systems: Outage Capacity and Power Allocation under Soft Sensing
    Asghari, Vahid
    Aiessa, Sonia
    GLOBECOM 2008 - 2008 IEEE GLOBAL TELECOMMUNICATIONS CONFERENCE, 2008,