How Contractor Behavior Affects Engineering Project Value-Added Performance

被引:45
|
作者
Liu, Junying [1 ]
Wang, Zhixiu [1 ]
Skitmore, Martin [2 ]
Yan, Ling [3 ]
机构
[1] Tianjin Univ, Coll Management & Econ, Dept Construct Management, 92 Weijin Rd, Tianjin 300072, Peoples R China
[2] Queensland Univ Technol, Sch Civil Engn & Built Environm, Brisbane, Qld 4001, Australia
[3] Tianjin Univ Technol, Coll Management, Dept Construct Management, 391 Bingshui West Rd, Tianjin 300384, Peoples R China
关键词
Engineering projects; Contractor behavior; Value added; Contract complexity; Task complexity; REDUCING OPPORTUNISTIC BEHAVIOR; TASK COMPLEXITY; ORGANIZATIONAL CITIZENSHIP; GOVERNANCE MECHANISMS; CONSTRUCTION PROJECTS; FORMAL CONTRACTS; IN-ROLE; IMPACT; MANAGEMENT; SATISFACTION;
D O I
10.1061/(ASCE)ME.1943-5479.0000695
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Contractors are one of the most important project participants, and their behavior has gained increasing attention for improving performance, but few studies have been devoted to focusing on the forms of contractor behavior and project value-added performance. This study developed and tested a theoretical model to investigate how different types of contractor behavior (perfunctory, consummate, and opportunistic) affect engineering project value added (EPVA) and analyze the moderating role of contract complexity and task complexity. The multiple regression analysis approach is used to analyze data collected from a survey of 290 Chinese project professionals. The results show that three types of contractor behavior have a significant impact on EPVA, that is, contractor perfunctory and consummate behaviors have a significant positive impact, whereas opportunistic behavior has a significant negative impact. In addition, contractor consummate behavior had the strongest impact, followed by perfunctory and opportunistic behaviors. The moderation results showed that the positive impact between perfunctory behavior and EPVA is strengthened and weakened by contract and task complexity, respectively, whereas the negative impact of opportunistic behavior is weakened and strengthened, respectively. The contract and task complexity have no significant moderating impact on the relationship between contractor consummate behavior and EPVA. The findings of this study contribute to the project governance and project performance literature and provide new knowledge for academe and practice for a deeper understanding of how to realize EPVA from the perspective of contractor behavior.
引用
收藏
页数:12
相关论文
共 50 条
  • [31] RePEc and how to provide value-added services a community of researchers
    Manuel Barrueco, Jose
    METODOS DE INFORMACION, 2013, 4 (06): : 5 - 15
  • [32] How the law can ensure the success of value-added tax
    Al-Amarri, Ali Salem
    INTERNATIONAL JOURNAL OF LAW AND MANAGEMENT, 2024,
  • [33] Study on the Influence of Value-added Tax on the Project Cost of Prefabricated Buildings
    Chen, Yu-ting
    Cao, Xin-ying
    Bao, Wei
    4TH INTERNATIONAL CONFERENCE ON ECONOMICS AND MANAGEMENT (ICEM), 2017, : 179 - 187
  • [34] Metabolic engineering of bakers' yeast for production of value-added lipids.
    Dyer, JM
    Chapital, DC
    Mullerr, RT
    Kuan, JCW
    Pepperman, AB
    ABSTRACTS OF PAPERS OF THE AMERICAN CHEMICAL SOCIETY, 2003, 225 : U87 - U87
  • [35] The internal performance measures of bank lending: a value-added approach
    Wei-Shong, Lin Peter
    Kuo-Chung, Mei Albert
    BENCHMARKING-AN INTERNATIONAL JOURNAL, 2006, 13 (03) : 272 - 289
  • [36] Value Management Program: Performance, Quantification, and Presentation of Imaging Value-Added Actions
    Patel, Samir
    JOURNAL OF THE AMERICAN COLLEGE OF RADIOLOGY, 2015, 12 (03) : 239 - 248
  • [37] How do Test Scores at the Ceiling Affect Value-Added Estimates?
    Resch, Alexandra
    Isenberg, Eric
    STATISTICS AND PUBLIC POLICY, 2018, 5 (01): : 1 - 6
  • [38] How does contractual governance affect construction project performance? The mediating role of the contractor's behavior
    Luo, Yazhuo
    Chen, Yuanze
    JOURNAL OF ASIAN ARCHITECTURE AND BUILDING ENGINEERING, 2024,
  • [39] A value-added predictive defect type distribution model based on project characteristics
    Hong, Youngki
    Baik, Jongmoon
    Ko, In-Young
    Choi, Ho-Jin
    7TH IEEE/ACIS INTERNATIONAL CONFERENCE ON COMPUTER AND INFORMATION SCIENCE IN CONJUNCTION WITH 2ND IEEE/ACIS INTERNATIONAL WORKSHOP ON E-ACTIVITY, PROCEEDINGS, 2008, : 469 - 474
  • [40] ECONOMIC-IMPACTS, VALUE-ADDED, AND BENEFITS IN REGIONAL PROJECT ANALYSIS - REPLY
    HAMILTON, JR
    WHITTLESEY, NK
    ROBISON, MH
    ELLIS, J
    AMERICAN JOURNAL OF AGRICULTURAL ECONOMICS, 1993, 75 (03) : 763 - 763