Effective Project Management with Theory of Constraints

被引:13
|
作者
Izmailov, Azar [1 ]
Korneva, Diana [1 ]
Kozhemiakin, Artem [2 ]
机构
[1] Kazan Privolzhsky Fed Univ, St Kremlevskaya 18, Kazan 420008, Russia
[2] TOC Team Consulting, St Moskovskaya 25-29, Kazan 420111, Russia
关键词
Buffer; Critical chain project management (CCPM); Drum buffer; Multiproject planning; Theory of Constraints (TOC);
D O I
10.1016/j.sbspro.2016.07.118
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Critical Chain Project Management (CCPM) is a TOC tool used for planning and project management. It can be used both in one-project and multi-project structures where resources are being used in several projects simultaneously. In one-project structures, this tool includes: 1) The elimination of the existing behavioral standards that are harmful to achieving the objectives of the project (finishing the job at the last moment, unreasonable delays in order to use maximum available time); 2) Plan (Project Network), which takes into account the relationship between all the resources and tasks, as well as time to perform tasks with attention to "safety net" in time; 3) The schedule of work, which is displays Critical Chain and buffers (half "safety net" time taken from individual tasks). For multi-project structures, this tool includes all the elements of the same tool designated to be used in a one-project structures, plus a tool to synchronize the implementation of projects - "drum", which can be either physical (resource) or virtual (a rule which states that it is inefficient to work on more than six projects). Both structures have an additional element that provides control and monitoring, - buffer management. Project Management Critical Chain method requires periodic updating of the time set for the completion of the tasks. This information is used to update the status of the various buffers, and provides information on when it is truly necessary to apply some corrective action. (C) 2016 The Authors. Published by Elsevier Ltd.
引用
收藏
页码:96 / 103
页数:8
相关论文
共 50 条
  • [21] Project on legal constraints on access to effective pain relief
    不详
    JOURNAL OF LAW MEDICINE & ETHICS, 1996, 24 (04): : 317 - 318
  • [22] An effective algorithm for project scheduling with arbitrary temporal constraints
    Smith, TB
    Pyle, JM
    PROCEEDING OF THE NINETEENTH NATIONAL CONFERENCE ON ARTIFICIAL INTELLIGENCE AND THE SIXTEENTH CONFERENCE ON INNOVATIVE APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2004, : 544 - 549
  • [23] Towards a theory of project management: The nature of the functions of project management
    Lille School of Management, France
    Int. J. Proj. Manage., 2006, 4 (277-279):
  • [24] The Role of Project Leadership in Achieving Effective Project Management
    Ong, Vincent
    Richardson, Diane
    Duan, Yanqing
    He, Qile
    Johnson, Brian
    PROCEEDINGS OF THE 5TH EUROPEAN CONFERENCE ON MANAGEMENT LEADERSHIP AND GOVERNANCE, 2009, : 157 - 163
  • [25] Application of project management theory to software project
    Cui, JD
    Zhang, MY
    PROCEEDINGS OF THE 2001 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING, VOLS I AND II, 2001, : 253 - 257
  • [26] Towards a theory of project management: The nature of the project
    Graduate School of Management, Lille, France
    不详
    Int. J. Proj. Manage., 2006, 1 (1-3):
  • [27] EFFECTIVE POTENTIALS, CONSTRAINTS, AND CRITICAL WETTING THEORY
    FISHER, ME
    JIN, AJ
    PHYSICAL REVIEW B, 1991, 44 (03): : 1430 - 1433
  • [28] Constraints on the effective fluid theory of stationary branes
    Jay Armas
    Troels Harmark
    Journal of High Energy Physics, 2014
  • [29] Constraints on the effective fluid theory of stationary branes
    Armas, Jay
    Harmark, Troels
    JOURNAL OF HIGH ENERGY PHYSICS, 2014, (10):
  • [30] Effective theory of inflationary magnetogenesis and constraints on reheating
    Maity, Debaprasad
    Pal, Sourav
    Paul, Tanmoy
    JOURNAL OF COSMOLOGY AND ASTROPARTICLE PHYSICS, 2021, (05):