共 50 条
- [34] Design and implementation of intelligent risk management system for city gas pipeline network based on GIS FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING, PTS 1-8, 2011, 71-78 : 4736 - +
- [35] Risk Analysis Model for Water Pipeline Leakage Based on FAHP and BPNN MACHINERY ELECTRONICS AND CONTROL ENGINEERING III, 2014, 441 : 1093 - 1096
- [37] Risk-based Resilience Assessment Model Focusing on Urban Infrastructure System Restoration 7TH INTERNATIONAL CONFERENCE ON BUILDING RESILIENCE: USING SCIENTIFIC KNOWLEDGE TO INFORM POLICY AND PRACTICE IN DISASTER RISK REDUCTION, 2018, 212 : 1115 - 1122
- [38] Editorial: Water infrastructure in the US: The need for a risk-based management system Technology, 2006, 9 (5-6): : 223 - 224
- [39] System Dynamics Analysis of Integrated Pipeline Corridor Based on Risk Loops TEHNICKI VJESNIK-TECHNICAL GAZETTE, 2022, 29 (01): : 259 - 268
- [40] A GIS-based Regional Scale Analysis of Urban Water Balance with an Aquifer-based Water Supply PROCEEDINGS OF BUILDING SIMULATION 2021: 17TH CONFERENCE OF IBPSA, 2022, 17 : 3323 - 3331