Green commercial building projects in Singapore: Critical risk factors and mitigation measures

被引:94
|
作者
Hwang, Bon-gang [1 ]
Shan, Ming [1 ]
Supa'at, Nur Nadiah Binte [2 ]
机构
[1] Natl Univ Singapore, Dept Bldg, 4 Architecture Dr, Singapore 117566, Singapore
[2] Marina Bay Sand, 10 Bayfront Ave, Singapore 018956, Singapore
关键词
Critical risk factors; Green commercial building projects; Risk mitigation measures; Singapore; PRIVATE PARTNERSHIP PROJECTS; CONSTRUCTION PROJECTS; SCHEDULE PERFORMANCE; MANAGEMENT; IDENTIFICATION; PERSPECTIVE; BARRIERS; RANKING; IMPACT;
D O I
10.1016/j.scs.2017.01.020
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Green buildings have achieved rapid development over the past two decades, yet research efforts on risk management in green building projects are still very limited. This study aims to identify and evaluate risk factors in green commercial building projects in Singapore, to compare their risk criticalities with those in traditional counterparts, and to propose mitigation measures that can tackle these risk factors. To achieve these goals, a comprehensive literature review and structured interviews were carried out, and a questionnaire survey was conducted with 25 Singapore-based construction companies. Survey results showed that the top five critical risk factors in green commercial building projects were "inflation," "currency and interest rate volatility worsened by the import of green materials," "durability of green materials," "damages caused by human error," and "shortage of green materials." Results also showed that green commercial building projects faced risks of design change and poor construction quality for less criticality than their traditional counterparts, but that the adoptions of green ideas, materials, and technologies had posed additional risks to green commercial building projects. Additionally, seven widely used risk mitigation measures were also proposed by this study. (C) 2017 Elsevier Ltd. All rights reserved.
引用
收藏
页码:237 / 256
页数:11
相关论文
共 50 条
  • [21] Study of risks in high rise building projects in India and the mitigation measures
    Sahu V.
    Sharma K.N.
    Asian Journal of Civil Engineering, 2023, 24 (7) : 1957 - 1967
  • [22] Value Management in Singaporean Building Projects: Implementation Status, Critical Success Factors, and Risk Factors
    Hwang, Bon-Gang
    Zhao, Xianbo
    Ong, Shi Ying
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2015, 31 (06)
  • [23] An Exploratory Analysis of Risks in Green Residential Building Construction Projects: The Case of Singapore
    Hwang, Bon-Gang
    Shan, Ming
    Phua, Helena
    Chi, Seokho
    SUSTAINABILITY, 2017, 9 (07)
  • [24] Factors influencing the spread of green building projects in the UAE
    Yas, Zinah
    Jaafer, Kamal
    JOURNAL OF BUILDING ENGINEERING, 2020, 27
  • [25] Vulnerability of risk paths of complex green building projects
    Qin X.
    Zhuo G.-J.
    Mo Y.-Y.
    2016, Zhejiang University (50): : 2177 - 2187
  • [26] Critical cost factors of building construction projects in Malaysia
    Toh, Tien-Choon
    Ting, Connie
    Ali, Kherun-Nita
    Aliagha, Godwin-Uche
    Munir, Omar
    INTERNATIONAL CONFERENCE ON ASIA PACIFIC BUSINESS INNOVATION AND TECHNOLOGY MANAGEMENT, 2012, 57 : 360 - 367
  • [27] Mitigation Measures for Significant Factors Instigating Cost Overrun in Highway Projects
    Sohu, Samiullah
    Bin Abdullah, Abd Halid
    Memon, Bashir Ahmed
    Nagapan, Sasitharan
    Bhatti, Nadeem Ul Kareem
    CIVIL ENGINEERING JOURNAL-TEHRAN, 2018, 4 (10): : 2338 - 2344
  • [28] Assessing Delay Factors and Mitigation Measures in Building Maintenance Works
    Yasin, Mohd Norazam
    Razman, Ruzaimah
    Nagapan, Sasitharan
    Moayedi, Farzaneh
    INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2023, 14 (03): : 129 - 136
  • [29] Public private partnership projects in Singapore: Factors, critical risks and preferred risk allocation from the perspective of contractors
    Hwang, Bon-Gang
    Zhao, Xianbo
    Gay, Mindy Jiang Shu
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2013, 31 (03) : 424 - 433
  • [30] Green building projects: schedule performance, influential factors and solutions
    Hwang, Bon-Gang
    Zhao, Xianbo
    Tan, Lene Lay Ghim
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2015, 22 (03) : 327 - 346