Risk-based integrity and inspection modeling (RBIIM) of process components/system

被引:37
|
作者
Khan, FI [1 ]
Haddara, MM
Bhattacharya, SK
机构
[1] Mem Univ Newfoundland, Fac Engn & Appl Sci, St John, NF A1B 3X5, Canada
[2] Indian Inst Technol, Dept Ocean Engn, Madras 600036, Tamil Nadu, India
关键词
failure modeling; integrity assessment and evaluation; quantitative risk assessment; risk-based inspection; risk-based maintenance;
D O I
10.1111/j.1539-6924.2006.00705.x
中图分类号
R1 [预防医学、卫生学];
学科分类号
1004 ; 120402 ;
摘要
Process plants deal with hazardous (highly flammable and toxic) chemicals at extreme conditions of temperature and pressure. Proper inspection and maintenance of these facilities is paramount for the maintenance of safe and continuous operation. This article proposes a risk-based methodology for integrity and inspection modeling (RBIIM) to ensure safe and fault-free operation of the facility. This methodology uses a gamma distribution to model the material degradation and a Bayesian updating method to improve the distribution based on actual inspection results. The method deals with the two cases of perfect and imperfect inspections. The measurement error resulting from imperfect inspections is modeled as a zero-mean, normally distributed random process. The risk is calculated using the probability of failure and the consequence is assessed in terms of cost as a function of time. The risk function is used to determine an optimal inspection and replacement interval. The calculated inspection and replacement interval is subsequently used in the design of an integrity inspection plan. Two case studies are presented: the maintenance of an autoclave and the maintenance of a pipeline segment. For the autoclave, the interval between two successive inspections is found to be 19 years. For the pipeline, the next inspection is due after 5 years from now. Measurements taken at inspections are used in estimating a new degradation rate that can then be used to update the failure distribution function.
引用
收藏
页码:203 / 221
页数:19
相关论文
共 50 条
  • [41] The use of influence diagrams in risk-based inspection
    San Cristobal, J. R.
    Biezma, M. V.
    SUSTAINABLE MARITIME TRANSPORTATION AND EXPLOITATION OF SEA RESOURCES, VOL 2, 2012, : 683 - 687
  • [42] Risk-Based Optimization of Inspection Planning in Ships
    Bharadwaj, Ujjwal
    Wintle, John
    JOURNAL OF SHIP PRODUCTION AND DESIGN, 2011, 27 (03): : 111 - 117
  • [43] Multilevel risk-based inspection scheme for FPSOs
    Lee, A. K.
    Serratella, C.
    Wang, G.
    Basu, R.
    Spong, R.
    MARINE TECHNOLOGY AND SNAME NEWS, 2007, 44 (02): : 118 - 124
  • [44] Verification of the Framework for Risk-Based Bridge Inspection
    Washer, Glenn
    Connor, Robert
    Nasrollahi, Massoud
    Reising, Rebecca
    JOURNAL OF BRIDGE ENGINEERING, 2016, 21 (04)
  • [45] An implementation of risk-based inspection for elevator maintenance
    Seung-Tae Park
    Bo-Suk Yang
    Journal of Mechanical Science and Technology, 2010, 24 : 2367 - 2376
  • [46] USDA rolls out risk-based inspection
    不详
    JAVMA-JOURNAL OF THE AMERICAN VETERINARY MEDICAL ASSOCIATION, 2007, 230 (07): : 982 - 982
  • [47] Refinery embraces risk-based inspection plan
    Anon
    Oil and Gas Journal, 1999, 97 (21): : 58 - 60
  • [48] Refinery embraces risk-based inspection plan
    不详
    OIL & GAS JOURNAL, 1999, 97 (21) : 58 - 60
  • [49] Risk-based inspection - where has it got to?
    不详
    MATERIALS WORLD, 2003, 11 (09) : 37 - 37
  • [50] Application of risk-based inspection in ethylene plant
    Han Jianyu
    Gao Jinjin
    Chen Guohua
    PROCEEDINGS OF THE ASME PRESSURE VESSELS AND PIPING CONFERENCE 2007, VOL 7: OPERATIONS, APPLICATIONS AND COMPONENTS, 2007, 7 : 3 - 6