A Decision-Making Algorithm for Concrete-Filled Steel Tubular Arch Bridge Maintenance Based on Structural Health Monitoring

被引:4
|
作者
Gui, Chengzhong [1 ]
Lin, Weiwei [2 ]
Huang, Zuwei [3 ]
Xin, Guangtao [4 ]
Xiao, Jun [5 ]
Yang, Liuxin [6 ]
机构
[1] Inst Disaster Prevent, Sch Civil Engn, Sanhe 065201, Peoples R China
[2] Aalto Univ, Dept Civil Engn, Espoo 02100, Finland
[3] Minist Transport PRC, Highway Monitoring & Response Ctr, Beijing 100005, Peoples R China
[4] China Highway Engn Consulting Grp Co Ltd, Beijing 100089, Peoples R China
[5] CCCC Second Highway Engn Co Ltd, Xian 710199, Peoples R China
[6] Waseda Univ, Dept Civil & Environm Engn, Tokyo 1698555, Japan
关键词
structural health monitoring; bridge maintenance decision-making; degenerated ultimate loading-capacity state; finite element analysis; performance evaluation; parameter regression; parameter prediction; DAMAGE DETECTION; COLUMNS; IDENTIFICATION; NETWORK;
D O I
10.3390/ma15196920
中图分类号
O64 [物理化学(理论化学)、化学物理学];
学科分类号
070304 ; 081704 ;
摘要
This study focuses on establishing a novel heuristic algorithm for life-cycle performance evaluation. Special attention is given to decision-making algorithms for concrete-filled steel tubular (CFST) arch bridge maintenance. The main procedure is developed, including the ultimate loading-capacity modeling of CFST members, multi-parameter selection, ultimate thresholds presetting based on the finite element method, data processing, crucial parameters determination among sub-parameters, multi-parameter regression, ultimate state prediction, and system maintenance decision-making suggestions based on the multi-parameter performance evaluation. A degenerated ultimate loading-capacity model of CFST members is adopted in the finite element analysis and multi-parameter performance assessment. The multi-source heterogeneous data processing and temperature-effect elimination are performed for the data processing. The key sub-parameters were determined by the Principal Component Analysis method and the Entropy-weight method. The polynomial mathematical model is used in the multi-parameter regression, and the +/- 95% confidence bounds were verified. The system maintenance decision-making model combines the relative monitoring state, the relative ultimate state by the numerical analysis, and the relative residual life of degenerated members. The optimal system maintenance decision-making suggestions for the bridge maintenance system can be identified, including the most unfavorable maintenance time and parameter index. A case study on a CFST truss-arch bridge is conducted to the proposed algorithms. The obtained results demonstrated that the crack width deserves special attention in concrete bridge maintenance. Additionally, these technologies have enormous potential for the life-cycle performance assessment of the structural health monitoring system for existing concrete bridge structures.
引用
收藏
页数:27
相关论文
共 50 条
  • [41] Key Parameter Influence Analysis of Half-Through Concrete-Filled Steel Tubular Arch Bridge
    Ye W.
    Wang L.
    Sun X.-D.
    Xu D.-J.
    Wang T.
    Bridge Construction, 2023, 53 (03) : 79 - 86
  • [42] Damage Identification of Concrete-filled Steel Tubular Arch Bridge using Data Fusion Based on Information Allocation Theory
    Jiang, Shao-Fei
    Fu, Da-bao
    Hu, Chun-Ming
    Wu, Zhao-Qi
    CEIS 2011, 2011, 15
  • [43] Design of Long-Span Concrete-Filled Steel Tubular Rigid Frame Tied Arch Bridge Based on Robustness
    Nie S.-J.
    Wang C.-C.
    Liu Q.
    Yang X.
    Bridge Construction, 2023, 53 : 91 - 97
  • [44] Rametric study of the ultimate load-carrying capacity of a concrete-filled steel tubular arch bridge
    Xia, Min
    Xiao, Rucheng
    Wu, Jianbo
    Huazhong Keji Daxue Xuebao (Ziran Kexue Ban)/Journal of Huazhong University of Science and Technology (Natural Science Edition), 2007, 35 (04): : 106 - 109
  • [45] Stability analysis on Jiangxi Ji'an Ganjiang Bridge designed in concrete-filled steel tubular arch style
    Wang, Y. Q.
    Jiang, B.
    Shi, Y. J.
    PROCEEDINGS OF THE 4TH INTERNATIONAL CONFERENCE ON NEW DIMENSIONS IN BRIDGES: FLYOVERS, OVERPASSES & ELEVATED STRUCTURES, 2006, : 303 - +
  • [46] Effects of model updating on the estimation of stochastic seismic response of a concrete-filled steel tubular arch bridge
    Li, Xi
    Zhang, De-Yi
    Yan, Wei-Ming
    Xie, Wei-Chau
    Pandey, Mahesh D.
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2014, 10 (12) : 1620 - 1637
  • [47] Debonding effects on ultimate bearing capacity of single tube concrete-filled steel tubular arch bridge
    Tu, Guang-Ya
    Yan, Dong-Huang
    Shao, Xu-Dong
    Harbin Gongye Daxue Xuebao/Journal of Harbin Institute of Technology, 2010, 42 (12): : 1999 - 2002
  • [48] System Reliability Analysis of Half-through Concrete-filled Steel Tubular Arch Bridge Based on Optimization Technique
    Jing, Lv
    PROCEEDINGS OF THE INTERNATIONAL SYMPOSIUM ON MECHANICAL ENGINEERING AND MATERIAL SCIENCE, 2016, 93 : 205 - 209
  • [49] Vehicle-bridge coupling vibration analysis of long-span concrete-filled steel tubular arch bridge
    Yao, Dunrong
    Deng, Nianchun
    Journal of Railway Science and Engineering, 2022, 19 (12) : 3693 - 3704
  • [50] Reliability evaluation of concrete-filled steel tube arch bridge based on DBN-PSOSA hybrid algorithm
    Lu, Pengzhen
    Xu, Zijie
    Hong, Tao
    Wu, Ying
    Li, Dengguo
    STRUCTURAL CONCRETE, 2021, 22 (04) : 2309 - 2321