The effect of the stabilization period on the economic lot scheduling problem

被引:9
|
作者
Moon, IK [1 ]
Hahm, JH
Lee, C
机构
[1] Pusan Natl Univ, Dept Ind Engn, Pusan 609735, South Korea
[2] Seoul Natl Univ, Dept Ind Engn, Seoul 151, South Korea
[3] LG Elect Ltd, Mfg Technol Ctr, Changwon 641, South Korea
关键词
D O I
10.1080/07408179808966557
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The Economic Lot Scheduling Problem (ELSP) is the problem of scheduling production of several items in a single facility, so that demands are met without stockouts or backorders, and the long run average inventory carrying and setup costs are minimized. One of the general assumptions in the ELSP is that the yield rates of a given manufacturing process are constant, or 100%, after setup. However, this assumption may not be true for certain manufacturing processes, in which the yield rates are quite low just after setup, and then increase over time. This period is called a stabilization period and yield rates gradually increase during this period until they reach the target rates, which are set empirically or strategically. The purpose of this paper is to clarify the effect of the stabilization period by applying the stabilization period concept to the ELSP, which has been widely applied to many production systems. In this paper, the problem is tackled in three stages: Firstly, we formulate a model and develop an algorithm, which provides a lower bound for a minimum cost. Secondly, we develop a heuristic procedure using the time-varying lot size approach. Finally, we solve a special case of the ELSP to rnd an upper bound using the common cycle approach.
引用
收藏
页码:1009 / 1017
页数:9
相关论文
共 50 条
  • [21] WHEN IS THE ECONOMIC LOT SCHEDULING PROBLEM EASY
    JONES, PC
    INMAN, RR
    IIE TRANSACTIONS, 1989, 21 (01) : 11 - 20
  • [22] New Algorithm for Economic Lot Scheduling Problem
    Luo, Rongwu
    PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON LOGISTICS SYSTEMS AND INTELLIGENT MANAGEMENT, VOLS 1-3, 2010, : 334 - 337
  • [23] A COMPUTATIONAL APPROACH TO THE ECONOMIC LOT SCHEDULING PROBLEM
    ROGERS, J
    MANAGEMENT SCIENCE, 1958, 4 (03) : 264 - 291
  • [24] Economic lot sizing problem with tank scheduling
    Onal, Mehmet
    van den Heuvel, Wilco
    Dereli, Meryem Merve
    Albey, Erinc
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2023, 308 (01) : 166 - 182
  • [25] The economic lot scheduling problem under extended basic period and power-of-two policy
    Sun, Hainan
    Huang, Huei-Chuen
    Jaruphongsa, Wikrom
    OPTIMIZATION LETTERS, 2010, 4 (02) : 157 - 172
  • [26] The economic lot scheduling problem under extended basic period and power-of-two policy
    Hainan Sun
    Huei-Chuen Huang
    Wikrom Jaruphongsa
    Optimization Letters, 2010, 4 : 157 - 172
  • [27] The impact of batch shipments on the Economic Lot Scheduling Problem
    Beck, Fabian G.
    Glock, Christoph H.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 96 : 126 - 139
  • [28] The economic lot scheduling problem without capacity constraints
    Yao, MJ
    ANNALS OF OPERATIONS RESEARCH, 2005, 133 (1-4) : 193 - 205
  • [29] Simulation optimization for the stochastic economic lot scheduling problem
    Loehndorf, Nils
    Minner, Stefan
    IIE TRANSACTIONS, 2013, 45 (07) : 796 - 810
  • [30] ECONOMIC LOT SCHEDULING FOR 2-PRODUCT PROBLEM
    LEE, CY
    DANUSAPUTRO, S
    IIE TRANSACTIONS, 1989, 21 (02) : 162 - 169