The closure of two-sided multiplications on C*-algebras and phantom line bundles

被引:1
|
作者
Gogic, Ilja [1 ,2 ]
Timoney, Richard M. [1 ]
机构
[1] Trinity Coll Dublin, Sch Math, Dublin 2, Ireland
[2] Univ Zagreb, Dept Math, Bijenicka Cesta 30, Zagreb 10000, Croatia
基金
爱尔兰科学基金会;
关键词
ELEMENTARY OPERATORS; APPROXIMATION; AUTOMORPHISMS; DERIVATIONS; NORMS;
D O I
10.1093/imrn/rnw248
中图分类号
O1 [数学];
学科分类号
0701 ; 070101 ;
摘要
For a C*-algebra A, we consider the problem when the set TM0(A) of all two-sided multiplications x (sic) axb (a, b is an element of A) on A is norm closed, as a subset of B(A). We first show that TM0(A) is norm closed for all prime C*-algebras A. On the other hand, if A congruent to Gamma(0)(epsilon) is an n-homogeneous C*-algebra, where E is the canonical Mn-bundle over the primitive spectrum X of A, we show that TM0(A) fails to be norm closed if and only if there exists a sigma-compact open subset U of X and a phantom complex line subbundle L of epsilon over U (i.e., L is not globally trivial, but is trivial on all compact subsets of U). This phenomenon occurs whenever n >= 2 and X is a CW-complex (or a topological manifold) of dimension 3 <= d < infinity.
引用
收藏
页码:607 / 640
页数:34
相关论文
共 50 条
  • [41] A branch-and-bound algorithm for two-sided assembly line balancing
    Er-Fei Wu
    Ye Jin
    Jin-Song Bao
    Xiao-Feng Hu
    The International Journal of Advanced Manufacturing Technology, 2008, 39 : 1009 - 1015
  • [42] A Genetic Algorithm for solving two-sided assembly line balancing problems
    Taha, Raghda B.
    El-Kharbotly, Amin K.
    Sadek, Yomna M.
    Afia, Nahid H.
    AIN SHAMS ENGINEERING JOURNAL, 2011, 2 (3-4) : 227 - 240
  • [43] A Heuristic Method for Two-sided Assembly Line Reconfiguration in IoT Environment
    Hu, Xiaofeng
    Wu, Chuanxun
    Zhang, Yahui
    JOURNAL OF INTERNET TECHNOLOGY, 2020, 21 (05): : 1491 - 1502
  • [44] A mathematical model and a genetic algorithm for two-sided assembly line balancing
    Kim, Yeo Keun
    Song, Won Seop
    Kim, Jun Hyuk
    COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (03) : 853 - 865
  • [45] Two-sided assembly line balancing considering the relationships between tasks
    Khorasanian, Danial
    Hejazi, Seyyed Reza
    Moslehi, Ghasem
    COMPUTERS & INDUSTRIAL ENGINEERING, 2013, 66 (04) : 1096 - 1105
  • [46] Two-sided assembly line balancing to maximize work relatedness and slackness
    Lee, TO
    Kim, Y
    Kim, YK
    COMPUTERS & INDUSTRIAL ENGINEERING, 2001, 40 (03) : 273 - 292
  • [47] An Integrated Method for Solving the Two-Sided Assembly Line Balancing Problems
    Wei, Nai-Chieh
    Liu, Shu-Fen
    Chen, Cheng-Hao
    Xu, Yo-Xuan
    Shih, Yi-Yu
    JOURNAL OF ADVANCED MANUFACTURING SYSTEMS, 2023, 22 (01) : 181 - 203
  • [48] The effect of two-sided roughness in rolling/sliding ehl line contacts
    Almqvist, A
    Larsson, R
    Transient Processes in Tribology, 2004, 43 : 243 - 251
  • [49] A branch-and-bound algorithm for two-sided assembly line balancing
    Wu, Er-Fei
    Jin, Ye
    Bao, Jin-Song
    Hu, Xiao-Feng
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2008, 39 (9-10): : 1009 - 1015
  • [50] Two-sided U-type assembly line balancing problem
    Agpak, Kursad
    Yeguel, M. Fatih
    Gokcen, Hadi
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (18) : 5035 - 5047