Customizing GQM Models for Software Project Monitoring

被引:8
|
作者
Monden, Akito
Matsumura, Tomoko
Barker, Mike [1 ]
Torii, Koji
Basili, Victor R. [2 ,3 ,4 ]
机构
[1] Nara Inst Sci & Technol, Grad Sch Informat Sci, Ikoma 6300192, Japan
[2] Univ Maryland, College Pk, MD 20742 USA
[3] Fraunhofer Ctr, College Pk, MD USA
[4] King Abdulaziz Univ, Jeddah 21413, Saudi Arabia
来源
基金
日本学术振兴会;
关键词
software process evaluation; software measurement; empirical software engineering; process improvement;
D O I
10.1587/transinf.E95.D.2169
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper customizes Goal/Question/Metric (GQM) project monitoring models for various projects and organizations to take advantage of the data from the software tool EPM and to allow the tailoring of the interpretation models based upon the context and success criteria for each project and organization. The basic idea is to build less concrete models that do not include explicit baseline values to interpret metrics values. Instead, we add hypothesis and interpretation layers to the models to help people of different projects make decisions in their own context. We applied the models to two industrial projects, and found that our less concrete models could successfully identify typical problems in software projects.
引用
收藏
页码:2169 / 2182
页数:14
相关论文
共 50 条
  • [1] A case study: GQM and TSP in a software engineering capstone project
    von Konsky, BR
    Robey, M
    18TH CONFERENCE ON SOFTWARE ENGINEERING EDUCATION & TRAINING, PROCEEDINGS, 2005, : 215 - 222
  • [2] The Software Project Progress Measurement Frame Based on GQM Model
    Li Ya-hong
    Li Jian
    Hao Ke-gang
    2013 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING (ICMSE), 2013, : 133 - 138
  • [3] GQM-Based Definition and Evaluation of Software Project Success Indicators
    Lavazza, Luigi
    Frumento, Enrico
    Mazza, Riccardo
    SOFTWARE TECHNOLOGIES (ICSOFT 2015), 2016, 586 : 228 - 249
  • [4] Customizing software development processes based on the project properties
    Baratimehr, Kazem
    Shams, Fereidoon
    IMECS 2007: INTERNATIONAL MULTICONFERENCE OF ENGINEERS AND COMPUTER SCIENTISTS, VOLS I AND II, 2007, : 1091 - +
  • [5] Formulation and Empirical Validation of a GQM Based Measurement Framework for a Software Project
    Southekal, Prashanth Harish
    Levin, Ginger
    2011 FIFTH INTERNATIONAL SYMPOSIUM ON EMPIRICAL SOFTWARE ENGINEERING AND MEASUREMENT (ESEM 2011), 2011, : 404 - 413
  • [6] A Recommender Algorithm to Automatically Generate Metrics for GQM Models in Software Development
    Gorb, Anna
    PROCEEDINGS OF THE 2022 INTERNATIONAL CONFERENCE ON MANAGEMENT OF DATA (SIGMOD '22), 2022, : 2539 - 2541
  • [7] Defining and Evaluating Software Project Success Indicators A GQM-based Case Study
    Lavazza, Luigi
    Frumento, Enrico
    Mazza, Riccardo
    2015 10TH INTERNATIONAL JOINT CONFERENCE ON SOFTWARE TECHNOLOGIES (ICSOFT), VOL 1, 2015, : 105 - 116
  • [8] Applying QIP/GQM in a maintenance project
    Politecnico di Milano, Milano, Italy
    Empir Software Eng, 2 (163-166):
  • [9] CUSTOMIZING APPLICATION SOFTWARE
    ZIMMERMANN, G
    ANGEWANDTE INFORMATIK, 1983, (03): : 114 - 119
  • [10] Applying GQM in an industrial software factory
    Fuggetta, Alfonso
    Lavazza, Luigi
    Morasca, Sandro
    Cinti, Stefano
    Oldano, Giandomenico
    Orazi, Elena
    ACM Transactions on Software Engineering and Methodology, 1998, 7 (04): : 411 - 448