Defining and Evaluating Software Project Success Indicators A GQM-based Case Study

被引:0
|
作者
Lavazza, Luigi [1 ,2 ]
Frumento, Enrico [1 ]
Mazza, Riccardo [3 ]
机构
[1] CEFRIEL, Via Fucini 2, Milan, Italy
[2] Univ Insubria, Dipartimento Sci Teor & Appl, Varese, Italy
[3] WIND, Ivrea, Italy
关键词
Software Measurement Process; Goal/Question/Metrics; GQM; Key Performance Indicators; KPI; Success Indicators;
D O I
暂无
中图分类号
TP31 [计算机软件];
学科分类号
081202 ; 0835 ;
摘要
KPI (Key Process Indicators) and success indicators are often defined in a rather generic and imprecise manner. This happens because they are defined very' early in the project's life, when little details about the project are known, or simply because the definition does not follow a systematic and effective methodology. We need to precisely define KPI and project success indicators, guarantee that the data upon which they are based can be effectively and efficiently measured, and assure that the computed indicators are adequate with respect to project objectives, and represent the viewpoints of all the involved stakeholders. A complete and coherent process for managing KPI and success indicators lifecycle -instrumented with specific techniques and tools, including the Goal/Question/Metrics (GQM) method for the definition of measures and the R statistic language and environment for analyzing data and computing indicators- was applied in the evaluation of the European research project MUSES. The MUSES case study shows that the proposed process provides an easy and well supported path to the definition and implementation of effective KPI and project success indicators.
引用
收藏
页码:105 / 116
页数:12
相关论文
共 50 条
  • [1] GQM-Based Definition and Evaluation of Software Project Success Indicators
    Lavazza, Luigi
    Frumento, Enrico
    Mazza, Riccardo
    SOFTWARE TECHNOLOGIES (ICSOFT 2015), 2016, 586 : 228 - 249
  • [2] A case study: GQM and TSP in a software engineering capstone project
    von Konsky, BR
    Robey, M
    18TH CONFERENCE ON SOFTWARE ENGINEERING EDUCATION & TRAINING, PROCEEDINGS, 2005, : 215 - 222
  • [3] GQM-based improvement of embedded, real-time software development practices
    Kopanas, V
    Sylaidis, V
    Nanakis, I
    EIGHTH IEEE INTERNATIONAL WORKSHOP ON SOFTWARE TECHNOLOGY AND ENGINEERING PRACTICE INCORPORATING COMPUTER AIDED SOFTWARE ENGINEERING, PROCEEDINGS, 1997, : 105 - 115
  • [4] The Software Project Progress Measurement Frame Based on GQM Model
    Li Ya-hong
    Li Jian
    Hao Ke-gang
    2013 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING (ICMSE), 2013, : 133 - 138
  • [5] Formulation and Empirical Validation of a GQM Based Measurement Framework for a Software Project
    Southekal, Prashanth Harish
    Levin, Ginger
    2011 FIFTH INTERNATIONAL SYMPOSIUM ON EMPIRICAL SOFTWARE ENGINEERING AND MEASUREMENT (ESEM 2011), 2011, : 404 - 413
  • [6] Evaluating Success Factors of Software Project Management in Global Software Development
    Alqahtani, Jarallah
    Siddique, Ansar
    Aseere, Ali M.
    Alasiry, Areej
    Naveed, Quadri Noorulhasan
    IEEE ACCESS, 2024, 12 : 22345 - 22358
  • [7] DEFINING 'PROJECT SUCCESS' FOR A COMPLEX PROJECT - THE CASE OF A NUCLEAR ENGINEERING DEVELOPMENT
    van Niekerk, S. I.
    Steyn, H.
    SOUTH AFRICAN JOURNAL OF INDUSTRIAL ENGINEERING, 2011, 22 (01) : 123 - 136
  • [8] Software project managers and project success: An exploratory study
    Procaccino, J. Drew
    Verner, June M.
    JOURNAL OF SYSTEMS AND SOFTWARE, 2006, 79 (11) : 1541 - 1551
  • [9] A Study of Factors That Influence the Software Project Success
    Monserrat, Maria
    Mas, Antonia
    Mesquida, Antoni-Lluis
    JOURNAL OF SOFTWARE-EVOLUTION AND PROCESS, 2025, 37 (02)
  • [10] Defining and evaluating success in paediatric cochlear implantation - An exploratory study
    Black, Jane
    Hickson, Louise
    Black, Bruce
    INTERNATIONAL JOURNAL OF PEDIATRIC OTORHINOLARYNGOLOGY, 2012, 76 (09) : 1317 - 1326