Modeling quality management in construction projects

被引:0
|
作者
Nasirzadeh, F. [1 ]
Khanzadi, M. [2 ]
Afshar, A. [2 ,3 ]
Howick, S. [4 ]
机构
[1] Payame Noor Univ, Fac Engn, Dept Civil Engn, Tehran, Iran
[2] Iran Univ Sci & Technol, Dept Civil Engn, Tehran, Iran
[3] Iran Univ Sci & Technol, Ctr Excellence Fundamental Studies Struct Mech, Tehran, Iran
[4] Univ Strathclyde, Dept Management Sci, Glasgow, Lanark, Scotland
关键词
Fuzzy logic; Modeling; Quality management; Simulation; System dynamics; SYSTEM DYNAMICS; DESIGN;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This research presents a dynamic mathematical system for modeling and simulating the quality management process in construction projects. Through sets of cause and effect feedback loops, all factors that internally and externally affect the quality management process are addressed. The proposed system integrates fuzzy logic with system dynamics simulation scheme to consider the uncertainties associated with the model parameters and estimation of the extra cost and time due to quality defects. Quantification of the consequences of the quality failures is performed based on the a-cut representation of fuzzy numbers and interval analysis. The proposed approach is efficient in modeling and analyzing a quality management process which is complex and dynamic in nature and involves various uncertainties. The proposed approach is implemented in a real submarine water supply pipe line project in order to evaluate its applicability and performance. The negative impacts resulting from quality failures are simulated. These negative impacts are mitigated by the implementation of alternative solutions.
引用
收藏
页码:14 / 22
页数:9
相关论文
共 50 条
  • [41] Impact of knowledge management on construction projects
    Suresh S.
    Olayinka R.
    Chinyio E.
    Renukappa S.
    Proc. Inst. Civ. Eng. Manag. Procure. Law, 1 (27-43): : 27 - 43
  • [42] Changes and change management in construction and IT projects
    Broechner, Jan
    Badenfelt, Ulrika
    AUTOMATION IN CONSTRUCTION, 2011, 20 (07) : 767 - 775
  • [43] A Change Management Toolkit for Construction Projects
    Sun, Ming
    Fleming, Andrew
    Senaratne, Sepani
    Motawa, Ibrahim
    Yeoh, Mei Lin
    ARCHITECTURAL ENGINEERING AND DESIGN MANAGEMENT, 2006, 2 (04) : 261 - 271
  • [44] Risk Management for Housing and Construction Projects
    Yang J.
    Yin S.
    Journal of Engineering, Project, and Production Management, 2024, 14 (01)
  • [45] Decision problems in management of construction projects
    Szafranko, E.
    3RD INTERNATIONAL CONFERENCE ON INNOVATIVE MATERIALS, STRUCTURES AND TECHNOLOGIES (IMST 2017), 2017, 251
  • [46] Risk Management Methods in Construction Projects
    Rehacek, Petr
    Bazsova, Blanka
    VISION 2020: SUSTAINABLE ECONOMIC DEVELOPMENT, INNOVATION MANAGEMENT, AND GLOBAL GROWTH, VOLS I-IX, 2017, 2017, : 3060 - 3069
  • [47] ORGANIZATION AND MANAGEMENT OF CONSTRUCTION PROJECTS IN NIGERIA
    NGOKA, NI
    BUILDING AND ENVIRONMENT, 1979, 14 (04) : 253 - 256
  • [48] Coordination process in construction projects management
    Alaloul, W. S.
    Liew, M. S.
    Zawawi, N. A.
    ENGINEERING CHALLENGES FOR SUSTAINABLE FUTURE, 2016, : 149 - 153
  • [49] Change order management for construction projects
    Ehrenreich-Hansen, F.
    Cost Engineering (Morgantown, West Virginia), 1994, 36 (03): : 25 - 28
  • [50] CAD AND MANAGEMENT OF CONSTRUCTION PROJECTS.
    Atkin, Brian L.
    Gill, E.Moira
    Journal of Construction Engineering and Management, 1986, 112 (04) : 557 - 565