Simulation optimization based ant colony algorithm for the uncertain quay crane scheduling problem

被引:24
|
作者
Rouky, Naoufal [1 ]
Abourraja, Mohamed Nezar [1 ]
Boukachour, Jaouad [1 ]
Boudebous, Dalila [1 ]
El Hilali Alaoui, Ahmed [2 ]
El Khoukhi, Fatima [3 ]
机构
[1] Normandie Univ, UNIHAVRE, F-76600 Le Havre, France
[2] Sidi Mohamed Ben Abdallah Univ, Fac Sci & Technol, Fes 2202, Morocco
[3] Moulay Ismail Univ, Fac Arts & Humanities, BP 11202, Meknes, Morocco
关键词
Container terminal; Simulation Optimization; Quay crane; Uncertainty; GENETIC ALGORITHM; BRANCH;
D O I
10.5267/j.ijiec.2018.2.002
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This work is devoted to the study of the Uncertain Quay Crane Scheduling Problem (QCSP), where the loading /unloading times of containers and travel time of quay cranes are considered uncertain. The problem is solved with a Simulation Optimization approach which takes advantage of the great possibilities offered by the simulation to model the real details of the problem and the capacity of the optimization to find solutions with good quality. An Ant Colony Optimization (ACO) meta-heuristic hybridized with a Variable Neighborhood Descent (VND) local search is proposed to determine the assignments of tasks to quay cranes and the sequences of executions of tasks on each crane. Simulation is used inside the optimization algorithm to generate scenarios in agreement with the probabilities of the distributions of the uncertain parameters, thus, we carry out stochastic evaluations of the solutions found by each ant. The proposed optimization algorithm is tested first for the deterministic case on several well-known benchmark instances. Then, in the stochastic case, since no other work studied exactly the same problem with the same assumptions, the Simulation Optimization approach is compared with the deterministic version. The experimental results show that the optimization algorithm is competitive as compared to the existing methods and that the solutions found by the Simulation Optimization approach are more robust than those found by the optimization algorithm. (C) 2019 by the authors; licensee Growing Science, Canada
引用
收藏
页码:111 / 132
页数:22
相关论文
共 50 条
  • [31] A Branch-and-Price Algorithm to Solve a Quay Crane Scheduling Problem
    Kenan, Nabil
    Diabat, Ali
    COMPLEX ADAPTIVE SYSTEMS, 2015, 2015, 61 : 527 - 532
  • [32] A simulation-based Genetic Algorithm approach for the quay crane scheduling under uncertainty
    Al-Dhaheri, Noura
    Jebali, Aida
    Diabat, Ali
    SIMULATION MODELLING PRACTICE AND THEORY, 2016, 66 : 122 - 138
  • [33] An exact algorithm for the unidirectional quay crane scheduling problem with vessel stability
    Sun, Defeng
    Tang, Lixin
    Baldacci, Roberto
    Lim, Andrew
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2021, 291 (01) : 271 - 283
  • [34] Some complexity results and an efficient algorithm for quay crane scheduling problem
    Liu, Ming
    Wang, Shijin
    Chu, Feng
    Xu, Yinfeng
    DISCRETE MATHEMATICS ALGORITHMS AND APPLICATIONS, 2016, 8 (04)
  • [35] Ant Colony Algorithm for Surgery Scheduling Problem
    Yin, Jiao
    Xiang, Wei
    ADVANCES IN SWARM INTELLIGENCE, ICSI 2012, PT I, 2012, 7331 : 198 - 205
  • [36] A heuristic for the quay crane scheduling problem based on contiguous bay crane operations
    Lu, Zhiqiang
    Han, Xiaole
    Xi, Lifeng
    Erera, Alan L.
    COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (12) : 2915 - 2928
  • [37] Ant colony optimization for the examination scheduling problem
    Dowsland, KA
    Thompson, JM
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2005, 56 (04) : 426 - 438
  • [38] Route Optimization for School Bus Scheduling Problem Based on a Distributed Ant Colony System Algorithm
    Elgarej, Mouhcine
    Mansouri, Khalifa
    Youssfi, Mohamed
    2017 INTELLIGENT SYSTEMS AND COMPUTER VISION (ISCV), 2017,
  • [39] A Solution to Resource-Constrained Project Scheduling Problem Based on Ant Colony Optimization Algorithm
    Yuan, Yongbo
    Wang, Kai
    Ding, Le
    HIS 2009: 2009 NINTH INTERNATIONAL CONFERENCE ON HYBRID INTELLIGENT SYSTEMS, VOL 1, PROCEEDINGS, 2009, : 446 - 450
  • [40] A quay crane scheduling problem: a heuristic approach
    Yang, Kang-hung
    PROCEEDINGS OF THE FOURTH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2010, : 254 - 258