An Optimization Approach Using in Production Scheduling with Different Order

被引:0
|
作者
Liao, Wenzhu [1 ]
Wang, Tong [1 ]
机构
[1] Chongqing Univ, Coll Mech Engn, Chongqing, Peoples R China
基金
美国国家科学基金会;
关键词
equipment failure; Weibull distribution; production scheduling; genetic algorithm;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Aiming at the production scheduling problem of many varieties and small quantities, this paper designs an optimization model of production scheduling that considered equipment failures, which makes production scheduling more in line with actual processing. Firstly, assumed that the equipment failure rate obeys Weibull distribution. The sum of equipment maintenance cost, labor cost and part processing cost is the cost of production scheduling. The optimization model is established by minimizing the makespan and minimizing the cost of production scheduling; Secondly, genetic algorithm is improved by adding a cloud model generator. Then designed the process of how to use improved genetic algorithm to solve the job shop scheduling problem considering machine failure; Finally, select the case, verify the design of the model and algorithm, the calculation results show that the model and algorithm proposed in this paper has certain practical value.
引用
收藏
页码:237 / 241
页数:5
相关论文
共 50 条
  • [1] Scheduling production for a sawmill: A robust optimization approach
    Varas, Mauricio
    Maturana, Sergio
    Pascual, Rodrigo
    Vargas, Ignacio
    Vera, Jorge
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2014, 150 : 37 - 51
  • [2] BAKERY PRODUCTION SCHEDULING OPTIMIZATION - A PSO APPROACH
    Hecker, F.
    Hussein, W. B.
    Hussein, M. A.
    Becker, T.
    10TH INTERNATIONAL CONFERENCE ON MODELING AND APPLIED SIMULATION, MAS 2011, 2011, : 289 - 294
  • [3] Integrated optimization approach for order assignment and scheduling problem
    Jiang, Da-Kui
    Li, Bo
    Tan, Jia-Yin
    Kongzhi yu Juece/Control and Decision, 2013, 28 (02): : 217 - 222
  • [4] Joint optimization of inter order scheduling and intra order scheduling for just-in-time precast production
    Xiong F.
    Wang L.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2023, 29 (04): : 1205 - 1217
  • [5] JIT APPROACH TO INTEGRATING PRODUCTION ORDER SCHEDULING AND PRODUCTION ACTIVITY CONTROL
    BANERJEE, P
    ARMOUTI, HA
    COMPUTER INTEGRATED MANUFACTURING SYSTEMS, 1992, 5 (04): : 283 - 290
  • [6] A Benders decomposition approach for order acceptance and scheduling problem: a robust optimization approach
    Emami, Saeed
    Moslehi, Ghasem
    Sabbagh, Mohammad
    COMPUTATIONAL & APPLIED MATHEMATICS, 2017, 36 (04): : 1471 - 1515
  • [7] A Benders decomposition approach for order acceptance and scheduling problem: a robust optimization approach
    Saeed Emami
    Ghasem Moslehi
    Mohammad Sabbagh
    Computational and Applied Mathematics, 2017, 36 : 1471 - 1515
  • [8] Hierarchical approach to production scheduling in make-to-order assembly
    Sawik, T
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2006, 44 (04) : 801 - 830
  • [9] Scheduling batch production using a stepwise approach
    Chan, KF
    Hui, CW
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2003, 42 (14) : 3505 - 3508
  • [10] Robust Order Scheduling in the Discrete Manufacturing Industry: A Multiobjective Optimization Approach
    Du, Wei
    Tang, Yang
    Leung, Sunney Yung Sun
    Tong, Le
    Vasilakos, Athanasios V.
    Qian, Feng
    IEEE TRANSACTIONS ON INDUSTRIAL INFORMATICS, 2018, 14 (01) : 253 - 264