共 50 条
- [31] A note on deteriorating jobs and learning effects on a single-machine scheduling with past-sequence-dependent setup times The International Journal of Advanced Manufacturing Technology, 2012, 58 : 723 - 725
- [32] A note on deteriorating jobs and learning effects on a single-machine scheduling with past-sequence-dependent setup times INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 58 (5-8): : 723 - 725
- [35] Note to: Deteriorating jobs and learning effects on a single-machine scheduling with past-sequence-dependent setup times The International Journal of Advanced Manufacturing Technology, 2012, 58 : 763 - 764
- [37] A matheuristic algorithm for multi-objective unrelated parallel machine scheduling problem JOURNAL OF THE FACULTY OF ENGINEERING AND ARCHITECTURE OF GAZI UNIVERSITY, 2023, 38 (03): : 1953 - 1966
- [38] Variable Neighborhood Search for Multi-Objective Parallel Machine Scheduling Problems PROCEEDINGS OF THE EIGHTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2009, 8 : 519 - 522
- [39] MULTI-OBJECTIVE SCHEDULING BY MAXIMIZING MACHINE PREFERENCES FOR UNRELATED PARALLEL MACHINES SIGMA JOURNAL OF ENGINEERING AND NATURAL SCIENCES-SIGMA MUHENDISLIK VE FEN BILIMLERI DERGISI, 2020, 38 (01): : 405 - 420