共 50 条
- [42] Taking into account the Tectonic Stress of the deposits in planning the layout and mining in hard-coal mining. Berg- und Huettenmaennische Monatshefte, 1988, 133 (10): : 436 - 441
- [44] Medium-term multi-plant capacity planning problems considering auxiliary tools for the semiconductor foundry INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 64 (9-12): : 1213 - 1230
- [45] Medium-term multi-plant capacity planning problems considering auxiliary tools for the semiconductor foundry The International Journal of Advanced Manufacturing Technology, 2013, 64 : 1213 - 1230
- [46] Modelling and optimisation method of mining works in hard coal mine with an application of stochastic networks. Part 4. Optimization procedure GOSPODARKA SUROWCAMI MINERALNYMI-MINERAL RESOURCES MANAGEMENT, 2007, 23 (01): : 121 - 128
- [47] A DESIGN METHOD OF FAULT TOLERANT CONTROL SYSTEMS USING FAULT ESTIMATOR FOR MULTI-PLANT SYSTEMS INTERNATIONAL JOURNAL OF INNOVATIVE COMPUTING INFORMATION AND CONTROL, 2025, 21 (01): : 227 - 237
- [48] Decentralized vs. centralized management of abnormal situations in a multi-plant enterprise using an agent-based approach 20TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, 2010, 28 : 1219 - 1224
- [49] A Multi-Plant Height Detection Method Based on Ruler-Free Monocular Computer Vision APPLIED SCIENCES-BASEL, 2024, 14 (15):
- [50] Traditional methods of optimization vs modem heuristic in mining works modeling issues in hard coal mines GOSPODARKA SUROWCAMI MINERALNYMI-MINERAL RESOURCES MANAGEMENT, 2008, 24 (02): : 43 - 58