Combination of geological radar and video surveillance in the tunnel geological prediction

被引:0
|
作者
Liu, Bo [1 ]
Li, Ning [1 ]
Lv, Gao [1 ]
机构
[1] Xian Univ Technol, Inst Geotech Engn, Xian 710048, Peoples R China
来源
关键词
tunnel project; geological advanced prediction; GPR; video surveillance; field trial;
D O I
10.4028/www.scientific.net/AMM.256-259.1206
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper presents the combination method between geological radar and video surveillance in the tunnel geological prediction, in case the randomness in judgment for the target body prone in the current geological advanced prediction. In order to improve the accuracy, this method conducts geological advanced prediction by comprehensive of geological radar, geological and construction information. In order to verify the effect of this method, we conducted a field trial in the Yululing tunnel. The field trial results are very well. And the accuracy of geological advanced prediction has been improved. This method reached the expected target for the accuracy which we want to improve of geological advanced prediction.
引用
收藏
页码:1206 / 1211
页数:6
相关论文
共 50 条
  • [21] Tunnel seismic tomography method for geological prediction and its application
    Yonggui Zhao
    Hui Jiang
    Xiaopeng Zhao
    Applied Geophysics, 2006, 3 (2) : 69 - 74
  • [22] The integrated prediction system for geological conditions ahead of tunnel faces
    Shirasagi, S.
    Yamamoto, T.
    Mito, Y.
    Ashraf, M.
    HARMONISING ROCK ENGINEERING AND THE ENVIRONMENT, 2012, : 1809 - 1812
  • [23] Study on the application of infrared water detector in the geological prediction of tunnel
    Liu Hong-mei
    2017 2ND INTERNATIONAL CONFERENCE ON MECHATRONICS AND INFORMATION TECHNOLOGY (ICMIT 2017), 2017, : 292 - 295
  • [24] Application Analysis of Comprehensive Advanced Geological Prediction in Karst Tunnel
    Wang, Chengliang
    Bai, Mingzhou
    Du, Yanqing
    Kuang, Xing
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING II, PTS 1-4, 2013, 405-408 : 1309 - 1313
  • [25] Optimization of tunnel overbreak prediction based on geological parameter analyses
    Lu, Zhongle
    Wu, Li
    Li, Bo
    Zhang, Xuewen
    Modern Tunnelling Technology, 2015, 52 (03) : 189 - 192
  • [26] Application Research of Geological Radar in Volcanic lava in the Geological Survey
    Xiao, Qiao Lin
    Lu, Fen
    VIBRATION, STRUCTURAL ENGINEERING AND MEASUREMENT II, PTS 1-3, 2012, 226-228 : 2093 - +
  • [27] The Research on Tunnel Surrounding Rock Classification Based on Geological Radar and Probability Theory
    Yong, Zhao Xiao
    Xin, Ji Yong
    Ying, Zuo Shuang
    3RD INTERNATIONAL CONFERENCE ON ENERGY EQUIPMENT SCIENCE AND ENGINEERING (ICEESE 2017), 2018, 128
  • [28] Hurtieres Tunnel geological hazard
    Pierre, H
    1999 RAPID EXCAVATION AND TUNNELING CONFERENCE, PROCEEDINGS, 1999, : 139 - 158
  • [29] Application of comprehensive geological prediction technology for water burst in the Tongluoshan tunnel
    Wu, Desheng, 1600, Editorial By Modern Tunnelling Technology, China (51):
  • [30] Geological prediction of karst-fractured groundwater in tunnel informational construction
    Xue Yi-guo
    Li Shu-cai
    Zhang Qing-song
    Li Shu-chen
    Su Mao-xin
    Liu Bin
    Liu Qin
    ROCK AND SOIL MECHANICS, 2008, 29 (12) : 3360 - 3364