Scheduling multi-mode resource-constrained tasks of automated guided vehicles with an improved particle swarm optimization algorithm

被引:9
|
作者
Xiao, Xiangjie [1 ]
Pan, Yaohui [1 ]
Lv, Lingling [1 ]
Shi, Yanjun [1 ]
机构
[1] Dalian Univ Technol, Mech Engn Dept, Dalian, Peoples R China
关键词
Constrained optimization;
D O I
10.1049/cim2.12016
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A modified particle swarm optimization (PSO) approach is presented for the multi-mode resource-constrained scheduling problem of automated guided vehicle (AGV) tasks. Various constraints in the scheduling process of the AGV system are analysed, and the types and quantities of AGVs as allocable resources are considered. The multiple-AGV combined distribution mode and its impact on distribution tasks is also considered. Finally, a multi-mode resource-constrained task scheduling model is established for which the object is to minimise material delivery time. Based on the above model, the discrete particle swarm optimization algorithm that improved the basic PSO was proposed. The simulation results with the test set in PSPLIB standard library showed the effectiveness of the improved PSO algorithm.
引用
收藏
页码:93 / 104
页数:12
相关论文
共 50 条
  • [21] Ant colony optimization with parameter adaptation for multi-mode resource-constrained project scheduling
    Chiang, Chuan-Wen
    Huang, Yu-Qing
    Wang, Wen-Yen
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2008, 19 (4-5) : 345 - 358
  • [22] A Path-Relinking algorithm for the multi-mode resource-constrained project scheduling problem
    Fernandes Muritiba, Albert Einstein
    Rodrigues, Carlos Diego
    da Costa, Franciio Araujo
    COMPUTERS & OPERATIONS RESEARCH, 2018, 92 : 145 - 154
  • [23] Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm
    Sprecher, A
    Drexl, A
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 107 (02) : 431 - 450
  • [24] An automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problem
    Messelis, Tommy
    De Causmaecker, Patrick
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2014, 233 (03) : 511 - 528
  • [25] AN IMPROVED ANT ALGORITHM FOR MULTI-MODE RESOURCE CONSTRAINED PROJECT SCHEDULING PROBLEM
    Peng Wuliang
    Huang Min
    Hao Yongping
    RAIRO-OPERATIONS RESEARCH, 2014, 48 (04) : 595 - 614
  • [26] Using Particle Swarm Optimization to Solve Resource-constrained Scheduling Problems
    Lo, Shih-Tang
    Chen, Ruey-Maw
    Shiau, Der-Fang
    Wu, Chung-Lun
    2008 IEEE CONFERENCE ON SOFT COMPUTING IN INDUSTRIAL APPLICATIONS SMCIA/08, 2009, : 38 - +
  • [27] Hybrid particle swarm optimization for preemptive resource-constrained project scheduling
    Shou, Yongyi
    Li, Ying
    Lai, Changtao
    NEUROCOMPUTING, 2015, 148 : 122 - 128
  • [28] Particle Swarm and Ant Colony Algorithms Hybridized for Multi-mode Resource-constrained Project Scheduling Problem with Minimum Time Lag
    Shan Miyuan
    Wu Juan
    Peng Danni
    2007 INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-15, 2007, : 5898 - 5902
  • [29] Local search for nonpreemptive multi-mode resource-constrained project scheduling
    Kolisch, R
    Drexl, A
    IIE TRANSACTIONS, 1997, 29 (11) : 987 - 999
  • [30] A Benders decomposition algorithm for the multi-mode resource-constrained multi-project scheduling problem with uncertainty
    Sadeghloo, Maryam
    Emami, Saeed
    Divsalar, Ali
    ANNALS OF OPERATIONS RESEARCH, 2024, 339 (03) : 1637 - 1677