Scheduling multi-mode resource-constrained tasks of automated guided vehicles with an improved particle swarm optimization algorithm

被引:9
|
作者
Xiao, Xiangjie [1 ]
Pan, Yaohui [1 ]
Lv, Lingling [1 ]
Shi, Yanjun [1 ]
机构
[1] Dalian Univ Technol, Mech Engn Dept, Dalian, Peoples R China
关键词
Constrained optimization;
D O I
10.1049/cim2.12016
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A modified particle swarm optimization (PSO) approach is presented for the multi-mode resource-constrained scheduling problem of automated guided vehicle (AGV) tasks. Various constraints in the scheduling process of the AGV system are analysed, and the types and quantities of AGVs as allocable resources are considered. The multiple-AGV combined distribution mode and its impact on distribution tasks is also considered. Finally, a multi-mode resource-constrained task scheduling model is established for which the object is to minimise material delivery time. Based on the above model, the discrete particle swarm optimization algorithm that improved the basic PSO was proposed. The simulation results with the test set in PSPLIB standard library showed the effectiveness of the improved PSO algorithm.
引用
收藏
页码:93 / 104
页数:12
相关论文
共 50 条
  • [1] A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems
    Jarboui, B.
    Damak, N.
    Siarry, P.
    Rebai, A.
    APPLIED MATHEMATICS AND COMPUTATION, 2008, 195 (01) : 299 - 308
  • [2] An Efficient Discrete Particle Swarm Optimization for Solving Multi-mode Resource-constrained Project Scheduling Problem
    Cui, Jianshuang
    Yu, Liruoyang
    2014 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2014, : 858 - 862
  • [3] Multi-mode resource-constrained scheduling for complex product design tasks
    Li, Yingzi
    Zhang, Shuo
    Zhang, Xiaodong
    Luo, Le
    MATERIALS AND MANUFACTURING TECHNOLOGY, PTS 1 AND 2, 2010, 129-131 : 566 - 571
  • [4] An improved particle swarm optimization for the resource-constrained project scheduling problem
    Jia, Qiong
    Seo, Yoonho
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 67 (9-12): : 2627 - 2638
  • [5] Hybridization of genetic algorithm and fully informed particle swarm for solving the multi-mode resource-constrained project scheduling problem
    Sebt, M. H.
    Afshar, M. R.
    Alipouri, Y.
    ENGINEERING OPTIMIZATION, 2017, 49 (03) : 513 - 530
  • [6] An improved particle swarm optimization for the resource-constrained project scheduling problem
    Qiong Jia
    Yoonho Seo
    The International Journal of Advanced Manufacturing Technology, 2013, 67 : 2627 - 2638
  • [7] Memetic algorithm for multi-mode resource-constrained project scheduling problems
    Shixin Liu
    Di Chen
    Yifan Wang
    Journal of Systems Engineering and Electronics, 2014, 25 (04) : 609 - 617
  • [8] Memetic algorithm for multi-mode resource-constrained project scheduling problems
    Liu, Shixin
    Chen, Di
    Wang, Yifan
    JOURNAL OF SYSTEMS ENGINEERING AND ELECTRONICS, 2014, 25 (04) : 609 - 617
  • [9] Particle swarm optimization for resource-constrained project scheduling
    Department of Building and Construction, City University of Hong Kong, Tat Avenue, Kowloon, Hong Kong
    不详
    Int. J. Proj. Manage., 2006, 1 (83-92):
  • [10] Bees Algorithm for multi-mode, resource-constrained project scheduling in molding industry
    Oztemel, Ercan
    Selam, Ayse Aycim
    COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 112 : 187 - 196