共 50 条
- [12] Flow-shop scheduling problem with fuzzy due window DYNAMICS OF CONTINUOUS DISCRETE AND IMPULSIVE SYSTEMS-SERIES B-APPLICATIONS & ALGORITHMS, 2006, 13 : 370 - 374
- [14] Scheduling a flow-shop problem with fuzzy processing time ICIC Express Letters, 2015, 9 (02): : 517 - 524
- [16] Palmer-based flexible flow-shop scheduling for continuous fuzzy domains NINTH IEEE INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS (FUZZ-IEEE 2000), VOLS 1 AND 2, 2000, : 363 - 368
- [17] A new fuzzy flexible flow-shop algorithm for continuous fuzzy domain MULTIPLE APPROACHES TO INTELLIGENT SYSTEMS, PROCEEDINGS, 1999, 1611 : 74 - 79
- [20] Generic simulation model for hybrid flow-shop Computers and Industrial Engineering, 1999, 37 (01): : 207 - 210