CONCRETE CREEP EFFECTS DURING BRIDGE SPAN CONSTRUCTION USING CANTILEVER CONCRETING TECHNOLOGY

被引:2
|
作者
Machelski, Czeslaw [1 ]
机构
[1] Wroclaw Univ Technol, Wydzial Budownictwa Ladowego & Wodnego, Wyb Wyspianskiego 27, PL-50370 Wroclaw, Poland
来源
ROADS AND BRIDGES-DROGI I MOSTY | 2019年 / 18卷 / 03期
关键词
assembly phase; cantilever concrete bridges; cantilever concreting technology; creep of concrete; monitoring; secondary moments;
D O I
10.7409/rabdim.019.013
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A characteristic feature of many long-span cantilever prestressed concrete bridges are excessive deflections of their spans due to the rheological processes in the concrete and in the prestressing steel. Such bridges are subject to monitoring during which geodetic surveys are usually conducted. The latter reveal changes in the deflection curves of the spans. In this paper span displacements resulting from concrete creep are analysed. A specific situation occurring when the span static scheme is changed from the cantilever (assembly stage) to continuous beam (exploitation stage) is considered. Assuming a regular three-span structure, a general solution to the problem is obtained for the following bridge parameters: dead load, span length, and the variable concrete creep index. The proposed algorithm is used in calculation examples in which different creep index distributions along the cantilevers are assumed. The results of the analyses are compared with the behaviour of a monitored existing bridge of this type. The analyses presented in this paper can be useful for the design of spans and the assessment of the safety of such bridges which are in service.
引用
收藏
页码:193 / 210
页数:18
相关论文
共 50 条
  • [31] Simulation of cantilever-casting construction of prestressed concrete cable-stayed bridge
    College of Civil Engineering and Architecture, Zhejiang University, Hangzhou 310027, China
    Huazhong Ligong Daxue Xuebao, 2008, 4 (115-118):
  • [32] Gust response of a prestressed concrete cable-stayed bridge under cantilever construction
    Niihara, Y
    Nakano, R
    Hayashida, K
    STRUCTURAL SAFETY AND RELIABILITY, VOLS. 1-3, 1998, : 1461 - 1464
  • [33] Stress Monitoring for Cantilever Construction of Concrete Continuous Bridge with Variable Cross-section
    Zhou, Bin
    Zhang, Xiang
    Xue, Yanguang
    PROCEEDINGS OF THE 2017 6TH INTERNATIONAL CONFERENCE ON ENERGY, ENVIRONMENT AND SUSTAINABLE DEVELOPMENT (ICEESD 2017), 2017, 129 : 1053 - 1059
  • [34] Control of wind-induced vibration in large span cable-stayed bridge with high piers during cantilever construction stages
    Gong, Cheng
    Liu, Zhi-Wen
    Xie, Gang
    Gong, Ping
    Gongcheng Lixue/Engineering Mechanics, 2015, 32 : 122 - 128
  • [35] Research on Monitoring Technology of Long-Span Prestressed Concrete Construction
    Liu, Jiliang
    Chu, Mingjin
    Xu, Shudong
    Yin, Yingying
    PROGRESS IN CIVIL ENGINEERING, PTS 1-4, 2012, 170-173 : 3145 - +
  • [36] Study on post creep deformation of long-span concrete continuous bridge with ballastless tracks
    He, Yi-Bin
    Tiedao Xuebao/Journal of the China Railway Society, 2008, 30 (04): : 120 - 124
  • [37] The influence of asymmetrical cantilever construction on low pylon cable-stayed bridge of the long span railway
    Guo Weiqiang
    Chen Quan
    2018 4TH INTERNATIONAL CONFERENCE ON SYSTEMS, COMPUTING, AND BIG DATA (ICSCBD 2018), 2019, : 168 - 173
  • [38] Monitoring concrete temperature during construction of the Confederation Bridge
    Gilliland, JA
    Dilger, WH
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 1997, 24 (06) : 941 - 950
  • [40] STUDY ON THE KEY TECHNOLOGY OF LONG-SPAN BRIDGE CONSTRUCTION IN MARINE ENVIRONMENT
    Yang, Xia
    Hao, Jing
    FRESENIUS ENVIRONMENTAL BULLETIN, 2022, 31 (10): : 9977 - 9987