Most of the literature on scheduling assumes that machines are always available. However, in real life industry, machines may be subject to some unavailability periods due to maintenance activities such as breakdowns (stochastic case) and preventive maintenance (deterministic case). In this paper we investigate the two-stage hybrid flow shop scheduling problem with only one machine on the first stage and m machines on the second stage to minimize the makespan. We consider that each machine is subject to at most one unavailability period. The start time and the end time of each period are known in advance (deterministic case) and only the non-resumable case is studied. First we discuss the complexity of the problem. Afterwards, we give the Branch and Bound model for this problem. Last, we calculate the worst-case performances of three heuristics: LIST algorithm, LPT algorithm and H-heuristic. (c) 2004 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1399 / 1419
页数:21
相关论文
共 50 条
  • [1] Distributed two-stage hybrid flow shop scheduling
    Zhang Q.
    Sun Z.
    Lei D.
    Huazhong Keji Daxue Xuebao (Ziran Kexue Ban)/Journal of Huazhong University of Science and Technology (Natural Science Edition), 2020, 48 (04): : 127 - 132
  • [2] Optimal scheduling of a two-stage hybrid flow shop
    Haouari, Mohamed
    Hidri, Lotfi
    Gharbi, Anis
    MATHEMATICAL METHODS OF OPERATIONS RESEARCH, 2006, 64 (01) : 107 - 124
  • [3] Optimal Scheduling of a Two-stage Hybrid Flow Shop
    Mohamed Haouari
    Lotfi Hidri
    Anis Gharbi
    Mathematical Methods of Operations Research, 2006, 64 : 107 - 124
  • [4] A TWO-STAGE FLOW SHOP SCHEDULING WITH A CRITICAL MACHINE AND BATCH AVAILABILITY
    Gerstl, Enrique
    Mosheiov, Gur
    FOUNDATIONS OF COMPUTING AND DECISION SCIENCES, 2012, 37 (01) : 39 - 56
  • [5] Analysis of a Heuristics for Scheduling Two-Stage Hybrid Flow Shop
    Xie, Xie
    Tang, Lixin
    INTERNATIONAL JOINT CONFERENCE ON COMPUTATIONAL SCIENCES AND OPTIMIZATION, VOL 2, PROCEEDINGS, 2009, : 879 - 882
  • [6] Scheduling a two-stage hybrid flow shop with parallel machines at the first stage
    Gupta, JND
    Hariri, AMA
    Potts, CN
    ANNALS OF OPERATIONS RESEARCH, 1997, 69 (0) : 171 - 191
  • [7] Scheduling a two-stage hybrid flow shop with parallel machines at the first stage
    J.N.D. Gupta
    A.M.A. Hariri
    C.N. Potts
    Annals of Operations Research, 1997, 69 : 171 - 191
  • [8] Distributed two-stage hybrid flow shop scheduling with setup times
    Cai J.
    Lei D.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2020, 26 (08): : 2170 - 2179
  • [9] Research on Two-Stage Hybrid Flow Shop Scheduling with Contiguous Machines
    Zhang Minghui
    Li Xiaofei
    2019 INTERNATIONAL CONFERENCE ON ROBOTS & INTELLIGENT SYSTEM (ICRIS 2019), 2019, : 458 - 461
  • [10] Two-stage hybrid flow shop scheduling with dynamic job arrivals
    Yao, Frank S.
    Zhao, Mei
    Zhang, Hui
    COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (07) : 1701 - 1712