Solving non-permutation flowshop scheduling problems by an effective iterated greedy heuristic

被引:59
|
作者
Ying, Kuo-Ching [1 ]
机构
[1] Huafan Univ, Dept Ind Engn & Management Informat, Taipei, Taiwan
来源
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY | 2008年 / 38卷 / 3-4期
关键词
scheduling; non-permutation flowshop; iterated greedy heuristic;
D O I
10.1007/s00170-007-1104-y
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Flowshop scheduling problems have received considerable research attention over the last five decades. This study proposes an iterated greedy heuristic for non-permutation flowshop scheduling problems. To validate and verify the proposed heuristic, computational experiments have been conducted on a well-known benchmark problem set, and the results are compared with 20 simple constructive heuristics and a state-of-the-art meta-heuristic performed on the same benchmark instances. In terms of both solution quality and computational expense, this study successfully develops an efficient and effective approach for non-permutation flowshop scheduling problems.
引用
收藏
页码:348 / 354
页数:7
相关论文
共 50 条
  • [11] An iterated greedy heuristic for multistage hybrid flowshop scheduling problems with multiprocessor tasks
    Ying, K-C
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2009, 60 (06) : 810 - 817
  • [12] An effective iterated greedy algorithm for the mixed no-idle permutation flowshop scheduling problem
    Pan, Quan-Ke
    Ruiz, Ruben
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2014, 44 : 41 - 50
  • [13] Iterated Greedy methods for the distributed permutation flowshop scheduling problem
    Ruiz, Ruben
    Pan, Quan-Ke
    Naderi, Bahman
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2019, 83 : 213 - 222
  • [14] Reinforcement learning iterated greedy algorithm for distributed assembly permutation flowshop scheduling problems
    Ying K.-C.
    Lin S.-W.
    Journal of Ambient Intelligence and Humanized Computing, 2023, 14 (08) : 11123 - 11138
  • [15] Solving scheduling problems for a non-permutation assembly flow shop
    Meng, Qiunan
    Xu, Xun
    2020 IEEE 16TH INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2020, : 508 - 513
  • [16] Non-permutation flowshop scheduling problem with minimal and maximal time lags: theoretical study and heuristic
    E. Dhouib
    J. Teghem
    T. Loukil
    Annals of Operations Research, 2018, 267 : 101 - 134
  • [17] An Adaptive Iterated Greedy algorithm for distributed mixed no-idle permutation flowshop scheduling problems
    Li, Yuan-Zhen
    Pan, Quan-Ke
    Li, Jun-Qing
    Gao, Liang
    Tasgetiren, M. Fatih
    SWARM AND EVOLUTIONARY COMPUTATION, 2021, 63
  • [18] Non-permutation flowshop scheduling problem with minimal and maximal time lags: theoretical study and heuristic
    Dhouib, E.
    Teghem, J.
    Loukil, T.
    ANNALS OF OPERATIONS RESEARCH, 2018, 267 (1-2) : 101 - 134
  • [19] An Iterated Greedy Heuristic for Mixed No-Wait Flowshop Problems
    Wang, Yamin
    Li, Xiaoping
    Ruiz, Ruben
    Sui, Shaochun
    IEEE TRANSACTIONS ON CYBERNETICS, 2018, 48 (05) : 1553 - 1566
  • [20] Efficient heuristic for solving non-permutation flow-shop scheduling problems with maximal and minimal time lags
    Ye, Song
    Zhao, Ning
    Li, Kaidian
    Lei, Chuanjin
    COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 113 : 160 - 184