Effect of project complexity on cost and schedule performance in transportation projects

被引:47
|
作者
Nguyen, Long D. [1 ]
Long Le-Hoai [2 ]
Tran, Dai Q. [3 ]
Dang, Chau N. [4 ]
Nguyen, Chau V. [5 ]
机构
[1] Florida Gulf Coast Univ, Dept Environm & Civil Engn, 10501 FGCU Blvd S, Ft Myers, FL 33965 USA
[2] Ho Chi Minh City Univ Technol, Fac Civil Engn, Ho Chi Minh City, Vietnam
[3] Univ Kansas, Dept Civil Environm & Architectural Engn, Lawrence, KS 66045 USA
[4] Ton Duc Thang Univ, Fac Civil Engn, Ho Chi Minh City, Vietnam
[5] Duy Tan Univ, Inst Res & Dev, Da Nang, Vietnam
关键词
Complexity; resource allocation; cost performance; schedule performance; transportation projects; MANAGEMENT; UNCERTAINTY; SUCCESS; GOVERNANCE; IMPACT; QUANTIFICATION; MEGAPROJECTS; DIMENSIONS; INNOVATION; DYNAMICS;
D O I
10.1080/01446193.2018.1532592
中图分类号
F [经济];
学科分类号
02 ;
摘要
Project complexity is a contributing factor to project performance. Understanding how project complexity interacts with management actions and project performance is imperative. This study fills this knowledge gap by empirically exploring the relationship between construction project complexity and project performance and their interaction with resource allocation. Empirical data were collected from 79 transportation projects. Due to its capability to build several regression models by adding independent variables to previous models, moderated hierarchical regression analyses were conducted to identify the underlying effect of resource allocation on the project complexity and performance relationship. The results show that: (i) project complexity was significantly correlated with schedule growth (positive correlation) but not significantly correlated with cost growth; (ii) resource allocation was significantly correlated with schedule growth (negative correlation) but not with cost growth; and (iii) resource allocation had a buffering effect where increasing resource allocation significantly decreases the effect of project complexity on schedule growth. The findings from this study contribute to the extant literature on construction project complexity by empirically showing that the impact of project complexity on schedule performance interacts with the level of resource allocation. This understanding of the role of resource allocation may help construction managers and engineers to better administer and manage their complex transportation projects. The findings also imply that organizations should appropriately evaluate project complexity to allocate necessary resources to achieve project success.
引用
收藏
页码:384 / 399
页数:16
相关论文
共 50 条
  • [21] The cost performance of transportation projects: The fallacy of the Planning Fallacy account
    Love, Peter E. D.
    Sing, Michael C. P.
    Ika, Lavagnon A.
    Newton, Sidney
    TRANSPORTATION RESEARCH PART A-POLICY AND PRACTICE, 2019, 122 : 1 - 20
  • [22] Cost and Schedule Performance in Higher Education Construction Projects in Saudi Arabia
    Aldossari, Khaled Medath
    ADVANCES IN CIVIL ENGINEERING, 2025, 2025 (01)
  • [23] Quantifying the Impact of Technology Utilization on Schedule and Cost Performance in Construction Projects
    Salih, Fareed
    El-adaway, Islam H.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2024, 150 (08)
  • [24] PREDICTING THE SCHEDULE AND COST PERFORMANCE IN PUBLIC SCHOOL BUILDING PROJECTS IN TAIWAN
    Juan, Yi-Kai
    Liou, Ling-Er
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2022, 28 (01) : 51 - 67
  • [25] Enhancing cost estimation performance through effective organizational control: the moderating role of project complexity in construction projects
    Fazil, Mohammad Waffy
    Tamyez, Puteri Fadzline Muhamad
    Lee, Chia Kuang
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (15) : 1630 - 1642
  • [26] Multilateral analysis of stakeholder integration, project complexity and project performance on information technology (IT) projects
    Ominde, Diana
    Ochieng, Edward Godfrey
    Zuofa, Tarila
    INTERNATIONAL JOURNAL OF PRODUCTIVITY AND PERFORMANCE MANAGEMENT, 2025, 74 (03) : 709 - 740
  • [27] Front End Engineering Design (FEED) for Large Industrial Projects: FEED Maturity and Its Impact on Project Cost and Schedule Performance
    Yussef, Abdulrahman
    Gibson, G. Edward, Jr.
    El Asmar, Mounir
    Ramsey, David
    CONSTRUCTION RESEARCH CONGRESS 2018: INFRASTRUCTURE AND FACILITY MANAGEMENT, 2018, : 1 - 8
  • [28] Prediction of cost and schedule performance in post-hurricane reconstruction of transportation infrastructure
    Safapour, Elnaz
    Kermanshachi, Sharareh
    Rouhanizadeh, Behzad
    PLOS ONE, 2023, 18 (03):
  • [29] Understanding the Key Risks Affecting Cost and Schedule Performance of Modular Construction Projects
    Abdul Nabi, Mohamad
    El-adaway, Islam H.
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2021, 37 (04)
  • [30] Equity metrics with risk, performance, and cost objectives for the prioritization of transportation projects
    Joshi, Nilesh N.
    Lambert, James H.
    IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2007, 54 (03) : 539 - 547