Effect of project complexity on cost and schedule performance in transportation projects

被引:47
|
作者
Nguyen, Long D. [1 ]
Long Le-Hoai [2 ]
Tran, Dai Q. [3 ]
Dang, Chau N. [4 ]
Nguyen, Chau V. [5 ]
机构
[1] Florida Gulf Coast Univ, Dept Environm & Civil Engn, 10501 FGCU Blvd S, Ft Myers, FL 33965 USA
[2] Ho Chi Minh City Univ Technol, Fac Civil Engn, Ho Chi Minh City, Vietnam
[3] Univ Kansas, Dept Civil Environm & Architectural Engn, Lawrence, KS 66045 USA
[4] Ton Duc Thang Univ, Fac Civil Engn, Ho Chi Minh City, Vietnam
[5] Duy Tan Univ, Inst Res & Dev, Da Nang, Vietnam
关键词
Complexity; resource allocation; cost performance; schedule performance; transportation projects; MANAGEMENT; UNCERTAINTY; SUCCESS; GOVERNANCE; IMPACT; QUANTIFICATION; MEGAPROJECTS; DIMENSIONS; INNOVATION; DYNAMICS;
D O I
10.1080/01446193.2018.1532592
中图分类号
F [经济];
学科分类号
02 ;
摘要
Project complexity is a contributing factor to project performance. Understanding how project complexity interacts with management actions and project performance is imperative. This study fills this knowledge gap by empirically exploring the relationship between construction project complexity and project performance and their interaction with resource allocation. Empirical data were collected from 79 transportation projects. Due to its capability to build several regression models by adding independent variables to previous models, moderated hierarchical regression analyses were conducted to identify the underlying effect of resource allocation on the project complexity and performance relationship. The results show that: (i) project complexity was significantly correlated with schedule growth (positive correlation) but not significantly correlated with cost growth; (ii) resource allocation was significantly correlated with schedule growth (negative correlation) but not with cost growth; and (iii) resource allocation had a buffering effect where increasing resource allocation significantly decreases the effect of project complexity on schedule growth. The findings from this study contribute to the extant literature on construction project complexity by empirically showing that the impact of project complexity on schedule performance interacts with the level of resource allocation. This understanding of the role of resource allocation may help construction managers and engineers to better administer and manage their complex transportation projects. The findings also imply that organizations should appropriately evaluate project complexity to allocate necessary resources to achieve project success.
引用
收藏
页码:384 / 399
页数:16
相关论文
共 50 条
  • [1] Using Project Team Integration to Predict Cost and Schedule Performance in Public Transportation Projects
    Silva, Arlys
    Harper, Christofer
    CONSTRUCTION RESEARCH CONGRESS 2018: INFRASTRUCTURE AND FACILITY MANAGEMENT, 2018, : 680 - 690
  • [2] Design-Build for Transportation Projects: Cost and Schedule Change Performance Analysis
    El Asmar, Mounir
    Ramsey, David
    Gibson, G. Edward, Jr.
    Bearup, Wylie
    JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2020, 12 (01)
  • [3] Cost and Schedule Performance Analysis of Transportation Public-Private Partnership Projects
    Ramsey, David
    El Asmar, Mounir
    JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2020, 12 (01)
  • [4] Cost and schedule performance in large government projects
    Welde, Morten
    Engebo, Atle
    12TH NORDIC CONFERENCE ON CONSTRUCTION ECONOMICS AND ORGANISATION, 2024, 2024, 1389
  • [5] Project Complexity Mapping in Five Dimensions for Complex Transportation Projects
    Gransberg, Douglas D.
    Shane, Jennifer S.
    Strong, Kelly
    del Puerto, Carla Lopez
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2013, 29 (04) : 316 - 326
  • [6] Impacts of Change Orders on Cost and Schedule Performance and the Correlation with Project Size of DB Building Projects
    Shrestha, Pramen P.
    Fathi, Medya
    JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2019, 11 (03)
  • [7] Integrative mechanisms in new product development projects effect of project complexity on project performance
    Lebcir, RM
    IEMC-2002: IEEE INTERNATIONAL ENGINEERING MANAGEMENT CONFERENCE, VOLS I AND II, PROCEEDINGS: MANAGING TECHNOLOGY FOR THE NEW ECONOMY, 2002, : 737 - 742
  • [8] Cost and Schedule Performance Benchmarks of US Transportation Public-Private Partnership Projects: Preliminary Results
    Ramsey, David W.
    El Asmar, Mounir
    TRANSPORTATION RESEARCH RECORD, 2015, (2504) : 58 - 65
  • [9] The complexity of transportation projects
    Constr Specifier, 2006, 10 (26-29):
  • [10] Cost, Change Order, and Schedule Performance of Highway Projects
    Shrestha, Bandana
    Shrestha, Pramen P.
    Maharjan, Ruiko
    Gransberg, Douglas
    JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2022, 14 (01)